Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: March 2025

Indication of route

This document provides design details for sign AJ11 - Indication of route.

Live
Issue Date: March 2025

Provision of Signage at Power Changeover Locations

This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.

Provision of Signage at Power Changeover Locations
RIS-3784-TOM Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2025

Do not raise pantograph (temporary power changeover)

This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).

Live
Issue Date: March 2025

Raise pantograph (temporary power changeover)

This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).

Live
Issue Date: March 2025

Power changeover not applicable

This document provides design details for sign AJ16 – Power changeover not applicable.

Live
Issue Date: March 2025

Maintaining the Visibility of Signals and Operational Signs

This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…

Maintenance of Signal and Operational Sign Visibility
RIS-8034-CCS Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2025

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Module Issue History
GERT8000 Issue Iss 37
September 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 40.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Changes to National Operations Publications for March 2025

This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…

Live
Issue Date: March 2025

AC Electrified Lines

You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…

AC Electrified Lines
GERT8000-AC Iss 7
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: June 2024

Route Availability

This technical note describes the standards associated with rail vehicle route availability (RA) numbers, and provides guidance on the application of…

Live
Issue Date: June 2024

Route Level Assessment of Technical Compatibility between Rail Vehicles and Underline Bridges

This document sets out requirements and guidance for the assessment of compatibility between rail vehicles and underline bridges at route level on the…

Route Level Assessment of Technical Compatibility between Rail Vehicles and Underline Bridges
RIS-8706-INS Iss 1
June 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2024

Guidance on evaluating excessive dynamic effects in underline bridges

This document provides guidance on evaluating and managing the risk of excessive dynamic effects in underline bridges resulting from the operating…

Live
Issue Date: May 2024

Fire safety of refurbished passenger seats​

This technical note provides guidance on the application of fire standards to existing vehicles undergoing refurbishment which affects passenger…

Live
Issue Date: May 2024

Public address interface to GSM-R

This technical note will help industry to determine GSM-R cab radio public address announcement priorities when integrated with the onboard public…

Live
Issue Date: March 2024

Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations

This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…

Live
Issue Date: March 2024

On-Train Camera Monitoring Systems

This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…

On-Train Camera Monitoring Systems
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Live
Issue Date: March 2024

Infrastructure Based Train Detection Interface Requirements

This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…

Infrastructure Based Train Detection Interface Requirements
GKRT0028 Iss 3.1
March 2024
Withdrawn
  • Briefing Notes: 1
Live
Issue Date: February 2024

Compliance with noise and vibration legislation

This technical note sets out the relevant railway-specific legislation on noise and vibration. It will help familiarise organisations with their…

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2025

Master Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Master Manual
GERM8000-master-module Iss 14.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Track Workers Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Track Workers Manual
GERM8000-trackworkers Iss 13.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Signaller and Signalling Technician Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Signaller and Signalling Technician Manual
GERM8000-signallersignallingtechnician Iss 14.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Train Driver Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Driver Manual
GERM8000-traindriver Iss 14.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Signals, Handsignals, Indicators and Signs Handbook

You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.

Signals, Handsignals, Indicators and Signs Handbook
RS521 Iss 7
September 2024
Live Pending Withdrawal
  • Impact Assessments 2
  • Deviations 2
Live
Issue Date: November 2024

List of Dangerous Goods and their United Nations Numbers

You will need this handbook if you need to understand what dangerous goods are, how they are classified and the meaning of their warning signs.

Live
Issue Date: November 2024

IWA or COSS setting up safe systems of work within possessions

You will need this handbook if you carry out the duties of an IWA or COSS setting up safe systems of work within possessions.

IWA or COSS setting up safe systems of work within possessions
GERT8000-HB9 Iss 8
November 2024
Withdrawn
  • Impact Assessments 1
  • Deviations 8
Live
Issue Date: November 2024

General signalling regulations

You will need this module if you carry out the duties of a signaller.

General signalling regulations
GERT8000-TS1 Iss 18
November 2024
Withdrawn
  • Impact Assessments 2
Live Pending Withdrawal
Issue Date: November 2024

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 40
November 2024
Withdrawn
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2025

Lower pantograph (temporary power changeover)

This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).  

Live
Issue Date: March 2025

Warning of Traction System Changeover

This document provides design details for sign AJ04 - Warning of traction system changeover.  

Warning of traction system changeover
Sign AJ04 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Changeover to or from self-powered

This document provides design details for sign AJ08 - Changeover to or from self-powered.

Live
Issue Date: March 2025

Directional arrows

This document provides design details for sign AJ10 - Directional arrows.  

Live
Issue Date: March 2025

Advance lower pantograph (temporary power changeover)

This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).

Live
Issue Date: March 2025

Changeover to Overhead Electric Traction

This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.

Live
Issue Date: March 2025

Do not raise pantograph

This document provides design details for sign AJ09 - Do not raise pantograph.  

Live
Issue Date: March 2025

Lower Pantograph

This document provides design details for sign AJ03 - Lower pantograph

Lower pantograph
Sign AJ03 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Indication of route

This document provides design details for sign AJ11 - Indication of route.

Live
Issue Date: March 2025

Do not raise pantograph (temporary power changeover)

This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: December 2024

Code of Practice for Defect Reporting for OTP, Plant and Equipment

This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…

Live
Issue Date: December 2024

Code of Practice for Defective OTP Safety Critical Equipment

This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…

Live
Issue Date: November 2024

Code of Practice for Load Lifting Points on Road Rail Excavator Cranes

This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…

Live
Issue Date: November 2024

Code of Practice for Lifting Operations Using Manually Propelled Rail Handlers (MPRH)

This Code of Practice details the various minimum requirements for Lifting and handling loads with Manually Propelled Rail Handlers (MPRH). This Code…

Live
Issue Date: November 2024

Code of Practice for Tandem Lifting with Two Excavator Cranes

This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…

Live
Issue Date: November 2024

Code of Practice for Flailing Operations using OTP

This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…

Code of Practice for Flailing Operations using OTP
COP0026 Iss 3
March 2025
Withdrawn
Live
Issue Date: November 2024

Code of Practice for Planning for the use of non-rail mounted plant

This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…

Live
Issue Date: November 2024

Code of Practice for Independence and Competence of LOLER Thorough Examiners

This Code of Practice details the various minimum requirements for independence of the examiner for Thorough Examination of lifting equipment and…

Live
Issue Date: November 2024

Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)

This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…

Live
Issue Date: July 2024

Code of Practice for Piling using OTP

This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…

Code of Practice for Piling using OTP
COP0034 Iss 1
September 2024
Withdrawn