Standards Catalogue
Search for standards by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1), or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:ERTMS/ETCS DMI National Requirements
This document sets out requirements for European Rail Traffic Management System/European Train Control System (ERTMS/ETCS) Driver Machine Interface…
GERT8402 Iss 3.1
July 2025
Live Pending Withdrawal
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 2
Key Plant Principles
This technical note is aimed at manufacturers of on-track machines (OTMs), manufacturers and converters of on-track plant (OTP), manufacturers of…
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for March 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Guidance Note on Management of Electrical Risk Related to Operational Tasks on Electrified Lines
This document provides railway undertakings and infrastructure managers (station operators) with guidance on the management and assessment of…
GEGN8575 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Requirements for the operation of freight trains and the conveyance of dangerous goods by any train
This document sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.
RIS-3781-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Medical Fitness Assessment
This document sets out requirements and guidance for the management of medical fitness assessment for safety critical workers on the GB mainline…
GOGN3655 Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
RIS-3451-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-3452-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 6
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Junction signal sighting
This technical note has been issued to help the industry manage the sighting of colour light junction signals. This document is responding to the RAIB…
TPWS receiver aerial location
This technical note will help industry identify the risks associated with mounting the Train Protection and Warning System (TPWS) receiver aerial…
Wheelsets handling and storage
This document sets out requirements and guidance for the handling and storage of wheelsets and their components.
RIS-2704-RST Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Level Crossing Systems
This document sets out requirements for level crossing systems and guidance on the application of controls to mitigate the risk of collision of a…
RIS-0792-CCS Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for March 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
AC Electrified Lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
End of Degraded Working
This document provides design details for sign AK215 - End of degraded working.
Sign AK215 Iss 1
September 2025
Withdrawn
- Impact Assessments 1
- Amendments: 1
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Document Type
Issue Date
From: To:Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.
Code of Practice for Defect Reporting for OTP, Plant and Equipment
This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…
COP0012 Iss 7
December 2024
Withdrawn
Code of Practice for Defective OTP Safety Critical Equipment
This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…
Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)
This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…
COP0007 Iss 7
March 2025
Withdrawn
Code of Practice for Tandem Lifting with Two Excavator Cranes
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…
Code of Practice for Load Lifting Points on Road Rail Excavator Cranes
This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…
COP0015 Iss 5
March 2025
Withdrawn
Code of Practice for Flailing Operations using OTP
This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…
Code of Practice for Planning for the use of non-rail mounted plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…
COP0028 Iss 1
March 2025
Withdrawn