Standards Catalogue
Search for standards by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1), or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:ERTMS/ETCS DMI National Requirements
This document sets out requirements for European Rail Traffic Management System/European Train Control System (ERTMS/ETCS) Driver Machine Interface…
GERT8402 Iss 3.1
July 2025
Live Pending Withdrawal
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 2
Key Plant Principles
This technical note is aimed at manufacturers of on-track machines (OTMs), manufacturers and converters of on-track plant (OTP), manufacturers of…
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for March 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Guidance Note on Management of Electrical Risk Related to Operational Tasks on Electrified Lines
This document provides railway undertakings and infrastructure managers (station operators) with guidance on the management and assessment of…
GEGN8575 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Maintaining the Visibility of Signals and Operational Signs
This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…
RIS-8034-CCS Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Reference Limits for Freight Wagon Defects
This document sets out the criteria for addressing defects in freight wagons arising during operation, and the restrictions on their use that apply.
RIS-2702-RST Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Engineering Design of On-Track Machines in Travelling and Working Modes
This document sets out requirements and guidance for the application of the BS EN 14033:2017 series for on-track Machines (OTMs) in their travelling…
RIS-1702-PLT Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 2
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for March 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
AC Electrified Lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
End of Degraded Working
This document provides design details for sign AK215 - End of degraded working.
Sign AK215 Iss 1
September 2025
Withdrawn
- Impact Assessments 1
- Amendments: 1
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Document Type
Issue Date
From: To:Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Management of Siding Safety Surveys
This Code of Practiceprovides guidance to enable the effective setting up of a safe system of work within all sidings allocated for stabling and…
Code of Practice for Route Knowledge within Possessions
This Code of Practice contains guidance and generic good practice for the management of route knowledge for train drivers within a possession. It sets…
Seasonal Operating of OTP
This poster is provided by the M&EE Networking Group to remind operators when adhesion is low, keep it slow.