Standards Catalogue
Search for standards by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1), or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
AC Electrified Lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
DC electrified lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer or competent person.
GERT8000-TW1 Iss 21
September 2025
Live Pending Withdrawal
- Impact Assessments 2
- Technical Notes 1
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles
This sets out Great Britain (GB) requirements on where TCAs shall be fitted onto a vehicle and how they shall be set up.
GMRT2477 Iss 3
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Use of Portable Ramps for Boarding and Alighting at Station Platforms
This TN provides guidance on the use of portable ramps and background information on the relevant requirements in the Accessibility National Technical…
Operation of Heritage Trains
This document sets out requirements for managing the planning and operation of heritage train services on the GB mainline railway.
RIS-3440-TOM Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reporting of Safety Related Information
The document sets out requirements for entering information into the Safety Management Intelligence System (SMIS). SMIS has been replaced by the Safe…
RIS-8047-TOM Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Guidance on the Infrastructure National Technical Specification Notice (INF NTSN)
This document gives guidance on interpreting the requirements of the Infrastructure National Technical Specification Notice (INF NTSN) for application…
GIGN7608 Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
GB Requirements for Platform Height, Platform Offset and Platform Width
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 37
Code of Practice for Management of Points within Engineering Work Sites
This Code of Practice provides guidance on the arrangements for the Management of Points within Engineering Worksites. It applies to all railborne…
COP0036 Iss 2
December 2025
Withdrawn
Traction capacitor safety awareness
This technical note aims to provide an understanding of good design and maintenance practices for capacitors, to reduce the risks of explosions caused…
Extended Block Working
This technical note will assist industry with the introduction of extended block working.
Hauling Unbraked Fixed Formations in Freight Trains
This document gives guidance on the braking requirements for hauling unbraked multiple units and other fixed formations in a freight train. This…
GMGN2607 Iss 2
September 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Passenger Train Dispatch and Platform Safety Measures
This document sets out requirements and guidance for the development, review and implementation of passenger train dispatch processes and measures to…
RIS-3703-TOM Iss 5
September 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for March 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
AC Electrified Lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
End of Degraded Working
This document provides design details for sign AK215 - End of degraded working.
Sign AK215 Iss 1
September 2025
Withdrawn
- Impact Assessments 1
- Amendments: 1
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Document Type
Issue Date
From: To:Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.
Code of Practice for Defect Reporting for OTP, Plant and Equipment
This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…
COP0012 Iss 7
December 2024
Withdrawn
Code of Practice for Defective OTP Safety Critical Equipment
This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…
Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)
This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…
COP0007 Iss 7
March 2025
Withdrawn
Code of Practice for Tandem Lifting with Two Excavator Cranes
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…
Code of Practice for Load Lifting Points on Road Rail Excavator Cranes
This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…
COP0015 Iss 5
March 2025
Withdrawn
Code of Practice for Flailing Operations using OTP
This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…
Code of Practice for Planning for the use of non-rail mounted plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…
COP0028 Iss 1
March 2025
Withdrawn