Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: March 2026

Signaller and Signalling Technician Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Signaller and Signalling Technician Manual
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

AC Electrified Lines

This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

AC Electrified Lines
GERT8000-AC Iss 9
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

AC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…

AC Electrified Lines
GERT8000-HB16 Iss 6
March 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

DC electrified lines

This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

DC electrified lines
GERT8000-DC Iss 7
September 2025
Live Pending Withdrawal
  • Impact Assessments 2
Live
Issue Date: March 2026

DC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…

DC Electrified Lines
GERT8000-HB17 Iss 5
March 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

Preparation and movement of trains

You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer or competent person.

Preparation and movement of trains
GERT8000-TW1 Iss 21
September 2025
Live Pending Withdrawal
  • Impact Assessments 2
  • Technical Notes 1
Live
Issue Date: March 2026

Track Workers Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Track Workers Manual
GERM8000-trackworkers Iss 15
March 2026
Withdrawn
Live
Issue Date: March 2026

Train Driver Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Driver Manual
GERM8000-traindriver Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

Train Operations Staff Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Operations Staff Manual
GERM8000-trainoperationsstaff Iss 16
March 2026
Withdrawn
Live
Issue Date: December 2025

Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles

This sets out Great Britain (GB) requirements on where TCAs shall be fitted onto a vehicle and how they shall be set up.

Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles
GMRT2477 Iss 3
December 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: December 2024

Time and Date in Railway Systems

This document sets out requirements and guidance for the use, interpretation and formatting of time and date information in railway systems.

Live
Issue Date: December 2024

Identification of roller bearing defects

This document sets out requirements and guidance for the identification and recording of roller bearing defects at overhaul, for taper, cylindrical…

Rail Industry Standard for the Identification of Roller Bearings Defects
RIS-2709-RST Iss 1
December 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Technical Notes 1
Live
Issue Date: December 2024

Psychometric Assessment in Train Driver Selection

This document sets out requirements and guidance on the psychometric assessment used during the selection process for train driver candidates who will…

Rail Industry Standard for Train Driver Selection
RIS-3751-TOM Iss 3
December 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: December 2024

Guidance on the Common Safety Method for Risk Evaluation and Assessment

This document gives guidance on application of the principles in the Common Safety Method for Risk Assessment and Evaluation.

Guidance on the Common Safety Method for Risk Evaluation and Assessment
GEGN8646 Iss 1
December 2024
Withdrawn
  • Briefing Notes: 1
Withdrawn
Issue Date: December 2024
Live
Issue Date: October 2024

Guidance on wagon maintenance related to recommendations from RAIB reports

This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…

Live
Issue Date: October 2024

Guidance on Operational Railway Safety Awareness

This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…

Guidance on Operational Railway Safety Awareness
GOGN3616 Iss 1
October 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: September 2024

Evidence conservation of failed axle bearings in service

This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…

Live
Issue Date: September 2024

Signing of Temporary and Emergency Speed Restrictions

This document sets out requirements, rationale and guidance for signing of Temporary Speed Restrictions (TSRs) and Emergency Speed Restrictions (ESRs)…

Signing of Temporary and Emergency Speed Restrictions
RIS-0735-CCS Iss 1
September 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: September 2024

Vehicle Registration, Marking and Numbering

This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline network.

Vehicle Registration, Marking and Numbering
RIS-2453-RST Iss 2.1
September 2024
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2026

Rule Book Handbook Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Handbook Issue History
GERT8000 Issue HB Iss 20
September 2025
Live Pending Withdrawal
Live
Issue Date: March 2026

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 42
September 2025
Live Pending Withdrawal
Live
Issue Date: March 2026

Dealing with a train accident or train evacuation

You will need this module if you carry out the duties of a driver, guard or signaller.

Dealing with a train accident or train evacuation
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

Changes to National Operations Publications for March 2026

This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…

Live
Issue Date: March 2026

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Module Issue History
GERT8000 Issue Iss 39
September 2025
Live Pending Withdrawal
Live
Issue Date: March 2026

Master Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Master Manual
GERM8000-master-module Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

Train stopped by train failure

You will need this module if you carry out the duties of a driver or signaller.

Train stopped by train failure
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

Signaller and Signalling Technician Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Signaller and Signalling Technician Manual
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

AC Electrified Lines

This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

AC Electrified Lines
GERT8000-AC Iss 9
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

AC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…

AC Electrified Lines
GERT8000-HB16 Iss 6
March 2025
Live Pending Withdrawal
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: September 2025

End of Degraded Working

This document provides design details for sign AK215 - End of degraded working.

End of Emergency special Working
Sign AK215 Iss 1
September 2025
Withdrawn
  • Impact Assessments 1
  • Amendments: 1
Live
Issue Date: March 2025

Advance lower pantograph (temporary power changeover)

This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).

Live
Issue Date: March 2025

Power changeover not applicable

This document provides design details for sign AJ16 – Power changeover not applicable.

Live
Issue Date: March 2025

Warning of Traction System Changeover

This document provides design details for sign AJ04 - Warning of traction system changeover.  

Warning of traction system changeover
Sign AJ04 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Raise pantograph (temporary power changeover)

This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).

Live
Issue Date: March 2025

Lower pantograph (temporary power changeover)

This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).  

Live
Issue Date: March 2025

Indication of route

This document provides design details for sign AJ11 - Indication of route.

Live
Issue Date: March 2025

Changeover to or from self-powered

This document provides design details for sign AJ08 - Changeover to or from self-powered.

Live
Issue Date: March 2025

Changeover to Overhead Electric Traction

This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.

Live
Issue Date: March 2025

Do not raise pantograph

This document provides design details for sign AJ09 - Do not raise pantograph.  

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Withdrawn
Issue Date: June 2025
Live
Issue Date: May 2025

Plant Activities with Any Line Open

All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager. 

Live
Issue Date: December 2024

Code of Practice for Defect Reporting for OTP, Plant and Equipment

This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…

Live
Issue Date: December 2024

Code of Practice for Defective OTP Safety Critical Equipment

This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…

Live
Issue Date: November 2024

Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)

This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…

Live
Issue Date: November 2024

Code of Practice for Tandem Lifting with Two Excavator Cranes

This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…

Live
Issue Date: November 2024

Code of Practice for Load Lifting Points on Road Rail Excavator Cranes

This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…

Live
Issue Date: November 2024

Code of Practice for Flailing Operations using OTP

This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…

Code of Practice for Flailing Operations using OTP
COP0026 Iss 3
March 2025
Withdrawn
Live
Issue Date: November 2024

Code of Practice for Planning for the use of non-rail mounted plant

This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…