Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: March 2026

Signaller and Signalling Technician Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Signaller and Signalling Technician Manual
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

AC Electrified Lines

This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

AC Electrified Lines
GERT8000-AC Iss 9
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

AC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…

AC Electrified Lines
GERT8000-HB16 Iss 6
March 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

DC electrified lines

This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

DC electrified lines
GERT8000-DC Iss 7
September 2025
Live Pending Withdrawal
  • Impact Assessments 2
Live
Issue Date: March 2026

DC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…

DC Electrified Lines
GERT8000-HB17 Iss 5
March 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

Preparation and movement of trains

You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer or competent person.

Preparation and movement of trains
GERT8000-TW1 Iss 21
September 2025
Live Pending Withdrawal
  • Impact Assessments 2
  • Technical Notes 1
Live
Issue Date: March 2026

Track Workers Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Track Workers Manual
GERM8000-trackworkers Iss 15
March 2026
Withdrawn
Live
Issue Date: March 2026

Train Driver Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Driver Manual
GERM8000-traindriver Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

Train Operations Staff Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Operations Staff Manual
GERM8000-trainoperationsstaff Iss 16
March 2026
Withdrawn
Live
Issue Date: December 2025

Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles

This sets out Great Britain (GB) requirements on where TCAs shall be fitted onto a vehicle and how they shall be set up.

Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles
GMRT2477 Iss 3
December 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: September 2025

Lineside Operational Signs

This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB catalogue. It also…

Lineside Operational Signs
RIS-0733-CCS Iss 1.3
September 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: September 2025

Train Service and Path Identifiers

This document sets out requirements and guidance on how to uniquely identify train services and paths in telematic messages used on the Great Britain…

Live
Issue Date: September 2025

Guidance Note on Competence and Training for Guards

This document provides a framework to assist railway undertakings in the management of training, competence and assessment of staff who undertake the…

Live
Issue Date: September 2025

Requirements for Speed Restrictions and Managing Overspeed Events

This document sets out requirements and guidance for the implementation of speed restrictions below the normal permissible speed of the line and the…

Live
Issue Date: September 2025

Defective On-Train Equipment

This document sets out requirements to be applied when on-train equipment becomes defective and provides guidance to assist the railway undertakings…

Defective On-Train Equipment
RIS-3437-TOM Iss 3
September 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Technical Notes 1
Live
Issue Date: July 2025

Crashworthiness risk assessment for mainline passenger rolling stock

This technical note aims to inform the industry about assessment against GMRT2100 issue one in relation to the Carmont rail accident, the process set…

Live Pending Withdrawal
Issue Date: July 2025

ERTMS/ETCS DMI National Requirements

This document sets out requirements for European Rail Traffic Management System/European Train Control System (ERTMS/ETCS) Driver Machine Interface…

ERTMS/ETCS DMI National requirements
GERT8402 Iss 3
July 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 9
Live
Issue Date: June 2025

Traction batteries in rolling stock depots

The technical note aims to inform the industry on handling, storage and the safe maintenance practices of lithium-ion traction battery packs within…

Live
Issue Date: June 2025

Fire compartmentation and Li-ion traction batteries

The technical note aims to inform the industry on adequate design considerations for crashworthiness and fire barrier considerations to minimise the…

Live
Issue Date: June 2025

Verification of Conformity of Engineering Change to Rail Vehicles

The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…

Verification of Conformity of Engineering Change to Rail Vehicles
RIS-2700-RST Iss 2
June 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Amendments: 1
  • Technical Notes 3
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2026

Rule Book Handbook Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Handbook Issue History
GERT8000 Issue HB Iss 20
September 2025
Live Pending Withdrawal
Live
Issue Date: March 2026

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 42
September 2025
Live Pending Withdrawal
Live
Issue Date: March 2026

Dealing with a train accident or train evacuation

You will need this module if you carry out the duties of a driver, guard or signaller.

Dealing with a train accident or train evacuation
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

Changes to National Operations Publications for March 2026

This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…

Live
Issue Date: March 2026

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Module Issue History
GERT8000 Issue Iss 39
September 2025
Live Pending Withdrawal
Live
Issue Date: March 2026

Master Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Master Manual
GERM8000-master-module Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

Train stopped by train failure

You will need this module if you carry out the duties of a driver or signaller.

Train stopped by train failure
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

Signaller and Signalling Technician Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Signaller and Signalling Technician Manual
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
Live
Issue Date: March 2026

AC Electrified Lines

This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

AC Electrified Lines
GERT8000-AC Iss 9
September 2025
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2026

AC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…

AC Electrified Lines
GERT8000-HB16 Iss 6
March 2025
Live Pending Withdrawal
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: September 2025

End of Degraded Working

This document provides design details for sign AK215 - End of degraded working.

End of Emergency special Working
Sign AK215 Iss 1
September 2025
Withdrawn
  • Impact Assessments 1
  • Amendments: 1
Live
Issue Date: March 2025

Advance lower pantograph (temporary power changeover)

This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).

Live
Issue Date: March 2025

Power changeover not applicable

This document provides design details for sign AJ16 – Power changeover not applicable.

Live
Issue Date: March 2025

Warning of Traction System Changeover

This document provides design details for sign AJ04 - Warning of traction system changeover.  

Warning of traction system changeover
Sign AJ04 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Raise pantograph (temporary power changeover)

This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).

Live
Issue Date: March 2025

Lower pantograph (temporary power changeover)

This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).  

Live
Issue Date: March 2025

Indication of route

This document provides design details for sign AJ11 - Indication of route.

Live
Issue Date: March 2025

Changeover to or from self-powered

This document provides design details for sign AJ08 - Changeover to or from self-powered.

Live
Issue Date: March 2025

Changeover to Overhead Electric Traction

This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.

Live
Issue Date: March 2025

Do not raise pantograph

This document provides design details for sign AJ09 - Do not raise pantograph.  

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Handbook (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: November 2024

Code of Practice for Independence and Competence of LOLER Thorough Examiners

This Code of Practice details the various minimum requirements for independence of the examiner for Thorough Examination of lifting equipment and…

Live
Issue Date: November 2024

Code of Practice for Lifting Operations Using Manually Propelled Rail Handlers (MPRH)

This Code of Practice details the various minimum requirements for Lifting and handling loads with Manually Propelled Rail Handlers (MPRH). This Code…

Live
Issue Date: July 2024

Code of Practice for Plant Modules on Rail Wagons and Trailers

This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This covers the use of plant…

Live
Issue Date: July 2024

Code of Practice for the Storage and Recommissioning of OTP

This Code of Practice is to define the actions that should be taken for any OTP designated as Out of Service recommending a minimum level of…

Withdrawn
Issue Date: July 2024
Live
Issue Date: March 2024

Code of Practice for OTM Driver Communication Review Group (CRG)

This Code of Practice supports the national strategy for improved Safety Critical Communications.  It provides a collaborative process (M&EE Group OTM…

Live
Issue Date: January 2024

Manually propelled equipment in a line blockage

This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…

Live
Issue Date: January 2024

Code of Practice for OTM Ready to Run Card

This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…

Code of Practice for OTM Ready to Run Card
COP0041 Iss 1
March 2024
Withdrawn
Live
Issue Date: January 2024

Code of Practice for Hydraulic Hose In-use Repair

This Code of Practice details the action to be taken following the failure of  hydraulic hose(s) on an on-track machine (OTM).

Code of Practice for Hydraulic Hose In-use Repair
COP0043 Iss 2
March 2024
Withdrawn
Live
Issue Date: January 2024

Code of Practice for Re-railing Kirow Cranes using Outriggers

This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.