Standards Catalogue
Search for standards by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1), or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Virtual platform edges
This technical note aims to clarify the attributes used for calculating clearances and stepping distances with respect to real and virtual platform…
Application of Probabilistic Gauging Methods
This document sets out requirements for the application of probabilistic gauging based on Monte Carlo methods to calculate clearances between rolling…
Operation of Urban Rail Vehicles on or adjacent to GB Mainline Infrastructure
This document gives guidance for the introduction and operation of urban rail vehicles on or adjacent to the GB mainline railway. This guidance is…
GEGN8502 Iss 1
December 2025
Withdrawn
Interface between Station Platforms, Track, Trains and Buffer Stops
This document sets out requirements for the design and maintenance of station platforms for their safe interface with trains, track and buffer stops.
RIS-7016-INS Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Application of the Accessibility NTSN
This document contains guidance on the application of the Accessibility (ACC) NTSN, particularly when undertaking work that would not necessarily…
GEGN8615 Iss 1
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Functionality and Management of Track Circuit Assisters (TCAs) on Rail Vehicles
This document sets out requirements for the functionality, testing and management of failures of TCAs on rail vehicles.
RIS-2777-RST Iss 1
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Tools 2
Use of Portable Ramps for Boarding and Alighting at Station Platforms
This TN provides guidance on the use of portable ramps and background information on the relevant requirements in the Accessibility National Technical…
Operation of Heritage Trains
This document sets out requirements for managing the planning and operation of heritage train services on the GB mainline railway.
RIS-3440-TOM Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reporting of Safety Related Information
The document sets out requirements for entering information into the Safety Management Intelligence System (SMIS). SMIS has been replaced by the Safe…
RIS-8047-TOM Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Guidance on the Infrastructure National Technical Specification Notice (INF NTSN)
This document gives guidance on interpreting the requirements of the Infrastructure National Technical Specification Notice (INF NTSN) for application…
GIGN7608 Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:End of Degraded Working
This document provides design details for sign AK215 - End of degraded working.
Sign AK215 Iss 1
September 2025
Withdrawn
- Impact Assessments 1
- Amendments: 1
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Document Type
Issue Date
From: To:OTP Mechanical Movement Limiting Device
This poster is provided by the M&EE Networking Group to remind the industry about the use of mechanical movement limiting devices and the restrictions…
Consequences of Lifting Whilst in "Dig Mode" or RCI Inactive / Overridden
This poster is provided by the M&EE Networking Group to remind industry about the serious consequences of lifting whilst in “Dig Mode” or if the RCI…
Rail Handling – Rail Turner Awareness
This poster is provided by the M&EE Networking Group to remind industry about the competence requirements necessary for the Crane Controller and…
Using Outriggers / Stabilisers on Plant
This poster is provided by the M&EE Networking Group to reminder planners and users of plant with outriggers that stability can be seriously affected…
Lifting Accessories Misuse
This poster is provided by the M&EE Networking Group to remind planners and users of plant about the dangers associated with the misuse of lifting…
Rated Capacity Indicator (RCI) Status Indicator Lights
This poster is provided by the M&EE Networking Group to remind industry about coloured indicator lights fitted to RRV excavator cranes and the…
OTP Tandem Lifting and Indication
This poster is provided by the M&EE Networking Group to remind planners to use the latest planning information/tools provided by the RCI suppliers for…
RCI Motion Cut
This poster is provided by the M&EE Networking Group to remind the industry that the RCI function automatically stops further movement of the machine…
Lift and Carry Using OTP in Road Mode
This poster is provided by the M&EE Networking Group to remind the operator of road-rail excavator cranes of the need for caution because lift and…
Twin Jib Crane Competence
This poster is provided by the M&EE Networking Group to remind industry that when using a twin jib crane under the control of one operator then there…