This document sets out requirements and guidance for the use, interpretation and formatting of time and date information in railway systems.
Identification of roller bearing defects
This document sets out requirements and guidance for the identification and recording of roller bearing defects at overhaul, for taper, cylindrical…
RIS-2709-RST Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Psychometric Assessment in Train Driver Selection
This document sets out requirements and guidance on the psychometric assessment used during the selection process for train driver candidates who will…
RIS-3751-TOM Iss 3
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on the Common Safety Method for Risk Evaluation and Assessment
This document gives guidance on application of the principles in the Common Safety Method for Risk Assessment and Evaluation.
GEGN8646 Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Signing of Temporary and Emergency Speed Restrictions
This document sets out requirements, rationale and guidance for signing of Temporary Speed Restrictions (TSRs) and Emergency Speed Restrictions (ESRs)…
RIS-0735-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline network.
RIS-2453-RST Iss 2.1
September 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for March 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
AC Electrified Lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
End of Degraded Working
This document provides design details for sign AK215 - End of degraded working.
Sign AK215 Iss 1
September 2025
Withdrawn
- Impact Assessments 1
- Amendments: 1
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Document Type
Issue Date
From: To:Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.
Code of Practice for Defect Reporting for OTP, Plant and Equipment
This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…
COP0012 Iss 7
December 2024
Withdrawn
Code of Practice for Defective OTP Safety Critical Equipment
This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…
Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)
This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…
COP0007 Iss 7
March 2025
Withdrawn
Code of Practice for Tandem Lifting with Two Excavator Cranes
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…
Code of Practice for Load Lifting Points on Road Rail Excavator Cranes
This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…
COP0015 Iss 5
March 2025
Withdrawn
Code of Practice for Flailing Operations using OTP
This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…
Code of Practice for Planning for the use of non-rail mounted plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…
COP0028 Iss 1
March 2025