Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: April 2025

Onboard passenger air quality improvement

This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…

Live
Issue Date: March 2025

Lower pantograph (temporary power changeover)

This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).  

Live
Issue Date: March 2025

Warning of Traction System Changeover

This document provides design details for sign AJ04 - Warning of traction system changeover.  

Warning of traction system changeover
Sign AJ04 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Changeover to or from self-powered

This document provides design details for sign AJ08 - Changeover to or from self-powered.

Live
Issue Date: March 2025

Directional arrows

This document provides design details for sign AJ10 - Directional arrows.  

Live
Issue Date: March 2025

Advance lower pantograph (temporary power changeover)

This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).

Live
Issue Date: March 2025

Changeover to Overhead Electric Traction

This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.

Live
Issue Date: March 2025

Do not raise pantograph

This document provides design details for sign AJ09 - Do not raise pantograph.  

Live
Issue Date: March 2025

Lower Pantograph

This document provides design details for sign AJ03 - Lower pantograph

Lower pantograph
Sign AJ03 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Overrun Risk Evaluation and Assessment

This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority. 

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Withdrawn
Issue Date: September 2024
Live
Issue Date: September 2024

Clarification on drugs and Alcohol testing for safety-critical workers

This technical note aims to provide a greater understanding of the importance of drugs and alcohol testing for safety-critical workers by providing…

Live
Issue Date: July 2024

Managing Low Adhesion

This standard sets out a framework to develop, implement, monitor and review the effectiveness of site-specific plans to manage low adhesion at…

Managing Low Adhesion
RIS-8040-TOM Iss 2
July 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2024

Lineside Signal and Indicator Product Design and Assessment Requirements

This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.

Lineside Signal and Indicator Product Design and Assessment Requirements
GKRT0057 Iss 1
September 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Amendments: 1
Live
Issue Date: June 2024

Rail Industry Standard for Driving Cabs

This document sets out supplementary requirements for the design, layout and operational equipment in driving cabs of rail vehicles to the Locomotive…

Rail Industry Standard for Driving Cabs
RIS-2761-RST Iss 1.1
June 2024
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Live
Issue Date: June 2024

Application of the WAG NTSN and NOI NTSN to the Design of Freight Wagons

This document provides guidance on the application of the Rolling Stock - Freight Wagon National Technical Specification Notice (WAG NTSN) and on the…

Guidance on Designing Rail Freight Wagons for use on the GB Mainline Railway
GMGN2688 Iss 2
June 2024
Withdrawn
  • Briefing Notes: 1
  • Amendments: 3
  • Technical Notes 2
Live
Issue Date: June 2024

NDT Processes on Rail Vehicles

This document sets out requirements and gives guidance for processes and the certification of operatives, equipment, and facilities used to undertake…

Rail Industry Standard for NDT Processes on Rail Vehicles
RIS-2701-RST Iss 1
June 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2024

Rail Industry Guidance Note on Vehicle Static Testing

This document gives guidance on meeting the requirements of GMRT2141 'Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway…

Guidance Note on Vehicle Static Testing
GMGN2641 Iss 1
June 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2024

Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway Vehicles

This document sets out requirements for railway vehicles regarding permissible track forces, derailment resistance and resistance to roll-over due to…

Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway Vehicles
GMRT2141 Iss 4.1
September 2024
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
  • Deviations 2
Live
Issue Date: June 2024

Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges

This document sets out requirements for the derivation and use of the Route Availability number for the assessment of compatibility between the static…

Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges
GERT8006 Iss 3
September 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live Pending Withdrawal
Issue Date: November 2024

Train Operations Staff Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Operations Staff Manual
GERM8000-trainoperationsstaff Iss 14
November 2024
Withdrawn
Live Pending Withdrawal
Issue Date: November 2024

Track Workers Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Track Workers Manual
GERM8000-trackworkers Iss 13
November 2024
Withdrawn
Live Pending Withdrawal
Issue Date: November 2024

Master Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Master manual
GERM8000-master-module Iss 14
November 2024
Withdrawn
Live Pending Withdrawal
Issue Date: November 2024

Signaller and Signalling Technician Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Signaller and Signalling Technician Manual
GERM8000-signallersignallingtechnician Iss 14
November 2024
Withdrawn
Live Pending Withdrawal
Issue Date: November 2024

Possession Workers Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Possession Workers Manual
GERM8000-possessionworkers Iss 10
November 2024
Withdrawn
Live Pending Withdrawal
Issue Date: November 2024

Train Driver Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Driver Manual
GERM8000-traindriver Iss 14
November 2024
Withdrawn
Live
Issue Date: September 2024

Shunting

You will need this module if you carry out the duties of a driver, guard, shunter or signaller.

Shunting
GERT8000-SS2 Iss 6
December 2024
Withdrawn
  • Impact Assessments 1
Live
Issue Date: September 2024

Speeds

You will need this module if you carry out the duties of a driver, signaller or train preparer.

Speeds
GERT8000-SP Iss 6
December 2024
Withdrawn
  • Impact Assessments 1
  • Deviations 3
Live
Issue Date: September 2024

Personnel asking for trains to be stopped form

This form is used by signallers to record the details when personnel ask for a line to be blocked for their own protection when going on or near the…

Live
Issue Date: September 2024

Level crossings - signallers' regulations

You will need this module if you carry out the duties of a signaller in an area where there is a level crossing.

Level crossings - signallers' regulations
GERT8000-TS9 Iss 4.1
December 2024
Withdrawn
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2025

Lower pantograph (temporary power changeover)

This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).  

Live
Issue Date: March 2025

Warning of Traction System Changeover

This document provides design details for sign AJ04 - Warning of traction system changeover.  

Warning of traction system changeover
Sign AJ04 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Changeover to or from self-powered

This document provides design details for sign AJ08 - Changeover to or from self-powered.

Live
Issue Date: March 2025

Directional arrows

This document provides design details for sign AJ10 - Directional arrows.  

Live
Issue Date: March 2025

Advance lower pantograph (temporary power changeover)

This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).

Live
Issue Date: March 2025

Changeover to Overhead Electric Traction

This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.

Live
Issue Date: March 2025

Do not raise pantograph

This document provides design details for sign AJ09 - Do not raise pantograph.  

Live
Issue Date: March 2025

Lower Pantograph

This document provides design details for sign AJ03 - Lower pantograph

Lower pantograph
Sign AJ03 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Indication of route

This document provides design details for sign AJ11 - Indication of route.

Live
Issue Date: March 2025

Do not raise pantograph (temporary power changeover)

This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: December 2024

Code of Practice for Defect Reporting for OTP, Plant and Equipment

This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…

Live
Issue Date: December 2024

Code of Practice for Defective OTP Safety Critical Equipment

This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…

Live
Issue Date: November 2024

Code of Practice for Load Lifting Points on Road Rail Excavator Cranes

This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…

Live
Issue Date: November 2024

Code of Practice for Lifting Operations Using Manually Propelled Rail Handlers (MPRH)

This Code of Practice details the various minimum requirements for Lifting and handling loads with Manually Propelled Rail Handlers (MPRH). This Code…

Live
Issue Date: November 2024

Code of Practice for Tandem Lifting with Two Excavator Cranes

This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…

Live
Issue Date: November 2024

Code of Practice for Flailing Operations using OTP

This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…

Code of Practice for Flailing Operations using OTP
COP0026 Iss 3
March 2025
Withdrawn
Live
Issue Date: November 2024

Code of Practice for Planning for the use of non-rail mounted plant

This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…

Live
Issue Date: November 2024

Code of Practice for Independence and Competence of LOLER Thorough Examiners

This Code of Practice details the various minimum requirements for independence of the examiner for Thorough Examination of lifting equipment and…

Live
Issue Date: November 2024

Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)

This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…

Live
Issue Date: July 2024

Code of Practice for Piling using OTP

This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…

Code of Practice for Piling using OTP
COP0034 Iss 1
September 2024
Withdrawn