Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Maintaining the Visibility of Signals and Operational Signs
This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…
RIS-8034-CCS Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Medical Fitness Assessment
This document sets out requirements and guidance for the management of medical fitness assessment for safety critical workers on the GB mainline…
GOGN3655 Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
RIS-3451-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-3452-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reference Limits for Freight Wagon Defects
This document sets out the criteria for addressing defects in freight wagons arising during operation, and the restrictions on their use that apply.
RIS-2702-RST Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 4
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Engineering Design of On-Track Machines in Travelling and Working Modes
This document sets out requirements and guidance for the application of the BS EN 14033:2017 series for on-track Machines (OTMs) in their travelling…
RIS-1702-PLT Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 2
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 10
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 15
Failure of, or work on, signalling equipment - signallers' regulations
You will need this module if you carry out the duties of a signaller.
GERT8000-TS11 Iss 6
December 2024
Withdrawn
- Impact Assessments 1
Duties of the engineering supervisor (ES) in a possession
You will need this handbook if you carry out the duties of the ES in a possession.
GERT8000-HB12 Iss 9
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 17
Defective or isolated vehicles and on-train equipment
You will need this module if you carry out the duties of a driver, guard, signaller or train preparer. It sets out the operational instructions to be…
GERT8000-TW5 Iss 12
December 2024
Withdrawn
- Impact Assessments 1
- Technical Notes 2
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11.1
December 2024
Withdrawn
- Deviations 5
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000)
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000)
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 6
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 1
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
ETCS Location Marker
This document provides design details for sign AB10 - ETCS location marker.
Permissible speed acceleration indicator
This document provides design details for sign AD06 - Permissible speed acceleration indicator.
Temporary speed restriction termination - Acceleration indicator
This document provides design details for sign AF09 - Temporary speed restriction termination - Acceleration indicator.
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…