Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Clarification on drugs and Alcohol testing for safety-critical workers
This technical note aims to provide a greater understanding of the importance of drugs and alcohol testing for safety-critical workers by providing…
Managing Low Adhesion
This standard sets out a framework to develop, implement, monitor and review the effectiveness of site-specific plans to manage low adhesion at…
Lineside Signal and Indicator Product Design and Assessment Requirements
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
GKRT0057 Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Rail Industry Standard for Driving Cabs
This document sets out supplementary requirements for the design, layout and operational equipment in driving cabs of rail vehicles to the Locomotive…
RIS-2761-RST Iss 1.1
June 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Application of the WAG NTSN and NOI NTSN to the Design of Freight Wagons
This document provides guidance on the application of the Rolling Stock - Freight Wagon National Technical Specification Notice (WAG NTSN) and on the…
GMGN2688 Iss 2
June 2024
Withdrawn
- Briefing Notes: 1
- Amendments: 3
- Technical Notes 2
NDT Processes on Rail Vehicles
This document sets out requirements and gives guidance for processes and the certification of operatives, equipment, and facilities used to undertake…
RIS-2701-RST Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rail Industry Guidance Note on Vehicle Static Testing
This document gives guidance on meeting the requirements of GMRT2141 'Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway…
GMGN2641 Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway Vehicles
This document sets out requirements for railway vehicles regarding permissible track forces, derailment resistance and resistance to roll-over due to…
GMRT2141 Iss 4.1
September 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges
This document sets out requirements for the derivation and use of the Route Availability number for the assessment of compatibility between the static…
GERT8006 Iss 3
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Changes to National Operations Publications for March 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 14.1
November 2024
Live Pending Withdrawal
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).