Standards Catalogue
Search for standards by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1), or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Guidance on the Energy National Technical Specification Notice
This document gives guidance on interpreting the requirements of the Energy National Technical Specification Notice (ENE NTSN) for application to the…
Route level assessment of technical compatibility between vehicles with traction batteries and infrastructure
The technical note aims to inform stakeholders on specific areas to carry out technical compatibility between battery-powered vehicles and…
Functioning and Control of Exterior Doors on Passenger Vehicles
This document sets out requirements for the design, function and control of power operated exterior door systems on passenger vehicles traversing the…
RIS-2747-RST Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
DC Conductor Rail Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the 750 V direct current (dc) conductor rail energy subsystem and the interfaces to rolling stock operating…
GLGN1612 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rolling Stock Subsystem and Interfaces to DC Conductor Rail Energy Subsystem
This document sets out requirements as National Technical Rules (NTRs) for rolling stock that traverses the Great Britain (GB) mainline 750 V direct…
GMRT2113 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Rolling Stock Subsystem and Interfaces to DC Conductor Rail Energy Subsystem
This document sets out requirements and guidance for all rolling stock operating over the Great Britain (GB) mainline 750 V dc conductor rail energy…
GMGN2613 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
DC Conductor Rail Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the 750 V direct current (dc) conductor rail energy subsystem and the interfaces to rolling stock operating…
GLRT1212 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on the Operation and Traffic Management National Technical Specification Notice (OPE NTSN)
This document provides guidance on the Operation and Traffic Management National Technical Specification Notice (OPE NTSN), including the application…
GOGN3615 Iss 2
March 2026
Withdrawn
- Briefing Notes: 1
General Guidance for National Technical Specification Notices
This Guidance Note is intended for transport operators, project entities, assessment bodies and other organisations with responsibilities related to…
Guidance on the Application of the Control Command and Signalling NTSN
This document gives guidance on interpreting the requirements of the Control, Command and Signalling National Technical Specification Notice (CCS…
GEGN8611 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:ERTMS/ETCS DMI National Requirements
This document sets out requirements for European Rail Traffic Management System/European Train Control System (ERTMS/ETCS) Driver Machine Interface…
GERT8402 Iss 3.1
July 2025
Live Pending Withdrawal
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 2
Key Plant Principles
This technical note is aimed at manufacturers of on-track machines (OTMs), manufacturers and converters of on-track plant (OTP), manufacturers of…
Guidance Note on Management of Electrical Risk Related to Operational Tasks on Electrified Lines
This document provides railway undertakings and infrastructure managers (station operators) with guidance on the management and assessment of…
GEGN8575 Iss 1
March 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles
This sets out Great Britain (GB) requirements on where TCAs shall be fitted onto a vehicle and how they shall be set up.
GMRT2477 Iss 3
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Virtual platform edges
This technical note aims to clarify the attributes used for calculating clearances and stepping distances with respect to real and virtual platform…
Application of Probabilistic Gauging Methods
This document sets out requirements for the application of probabilistic gauging based on Monte Carlo methods to calculate clearances between rolling…
Operation of Urban Rail Vehicles on or adjacent to GB Mainline Infrastructure
This document gives guidance for the introduction and operation of urban rail vehicles on or adjacent to the GB mainline railway. This guidance is…
GEGN8502 Iss 1
December 2025
Withdrawn
Interface between Station Platforms, Track, Trains and Buffer Stops
This document sets out requirements for the design and maintenance of station platforms for their safe interface with trains, track and buffer stops.
RIS-7016-INS Iss 2
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Application of the Accessibility NTSN
This document contains guidance on the application of the Accessibility (ACC) NTSN, particularly when undertaking work that would not necessarily…
GEGN8615 Iss 1
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Functionality and Management of Track Circuit Assisters (TCAs) on Rail Vehicles
This document sets out requirements for the functionality, testing and management of failures of TCAs on rail vehicles.
RIS-2777-RST Iss 1
December 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Tools 2
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for March 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-M2 Iss 8
September 2025
Live Pending Withdrawal
- Impact Assessments 1
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 16
March 2026
Withdrawn
AC Electrified Lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
End of Degraded Working
This document provides design details for sign AK215 - End of degraded working.
Sign AK215 Iss 1
September 2025
Withdrawn
- Impact Assessments 1
- Amendments: 1
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.