RIS-0734-CCS Iss 2
Signing of Permissible Speeds
Synopsis
This document sets out requirements, rationale and guidance for signing of permissible speeds on the Great Britain (GB) mainline railway.
Summary Of Changes
The content in RIS-0734-CCS issue two has been completely rewritten to provide better clarity on each requirement and to provide a robust rationale and guidance on how to meet the requirement. The redrafted, revised and new content is intended to be easier to understand, which should reduce the likelihood of misinterpretation and misuse. Additional requirements setting out which signs are used, reflect existing good practice which was not previously specified as prescriptive requirements.
Optional reading and resources:
Read full standard
Registered
Withdrawn
Rail Industry Standard
- Issued:
- 05/12/2020
- Published:
- 05/12/2020
- In Force:
- 05/12/2020
- Withdrawn:
- 07/09/2024
- Last Review:
- 28/07/2022
- Next Review:
- 05/12/2027
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | RIS-0734-CCS Iss 1, RIS-8012-CCS Iss 1 |
Superseded By | RIS-0734-CCS Iss 2.1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Traffic Operation and Management - TOM; Energy - ENE |
Briefing Notes | 20 BN16 |
Impact Assessments
Registered |
20 IA15 |
Supporting Documents | GIRT7033 Iss 4 ; RIS-0733-CCS Iss 1 |