Improving how trains interact with the supply network could help manage the growing demand for electric traction power.
Demand for energy from the traction power network is ever increasing. On some routes the power supply is already at capacity at peak times. To meet the decarbonisation challenge, more trains will need to draw on the traction grid, including freight locomotives and multi-mode trains charging their traction batteries. To unlock more electric train paths and improve resilience in the most affordable way, we need a fully integrated approach for electric traction systems—one that considers both on-train equipment and electrification infrastructure.
First, we needed a robust understanding of how different existing fleets interact with the power supply. Research published in December 2025 (T1331) examined whether existing traction power constraints are necessary and how they impact system performance. Key topics investigated included maximum train current, minimum pantograph voltage, automatic current limitation function, and power frequency harmonics. The research suggested several changes in voltage regulation to improve power availability and reliability.
Some of the changes can be taken forward via amended standards, while others need further research. Working with stakeholders from across GB rail, including the Vehicle/Train Energy System Interface Committee, we are pursuing six further research projects focusing on:
- Establishing rolling stock and infrastructure data requirements to enable better use of electric traction (T1426)
- Developing the case for, and migration path towards, an enhanced Automatic Current Limitation function across electric rolling stock (T1427)
- Assessing options for older rolling stock that have poor power factors and therefore have a significant impact on energy availability (T1428)
- Feasibility studies on the introduction of active current controls on rolling stock to proactively manage and mitigate power limitations (COF-UKRRIN2P-008)
- Exploring the possibility of defining a typical harmonic profile for modern traction systems to support grid connection planning (T1429)
- Clarifying the implications of traction power arrangements for train planning and operation (T1430).
Get involved
To keep up to date and get involved in the above programme of work, contact Mark Hanham, Senior Research Analyst: Mark.Hanham@rssb.co.uk