Overspeed


Not every safety risk announces itself.

Overspeeding remains a significant and credible challenge for safe train operations. Overspeeding can result in a bumpy ride for passengers, damage to infrastructure or rolling stock, and, in the worst case, a train derailing at speed. Exceeding Permanent Speed Restrictions (PSRs) at junctions is one of the rail industry’s primary concerns, including that of the Office of Rail and Road (ORR).

overspeed-1

RSSB has developed the Junction Overspeed Risk Assessment Tool (JORAT) in collaboration with Network Rail and train operating companies to assess the risk at junctions. It is based on the assumption that overspeed junction risk is driven by human performance vulnerabilities–particularly expectation–interacting with underlying system changes to the signalled route and the associated speed restrictions.

Risk increases when these combine–for example a driver’s expectation of the route ahead differs from the route that is actually set. Regulation, where the train can be moved on to another line, is where the majority of risk for junction overspeed occurs. This is when trains are only occasionally diverted on to a lower-speed route, the change may not be recognised early enough to allow timely adjustment of train speed, increasing the likelihood of a junction overspeed event.

The driver begins to accelerate for what they believe is the intended route, but the speed reached is inappropriate for the lower-speed turnout. Added to this is the fact that modern rolling stock accelerates much more quickly than many of the fleets they replaced, so higher speeds can be reached in a shorter time and distance, thus increasing the overspeed risk at junctions. Industry has long recognised the potential consequences of an overspeed event. But it needs data and evidence to tackle the issue. Industry leaders want answers to two simple questions: How fast are our trains going? And where does that create risk?

The challenge is to work out how significant the risk is, knowing where it is most likely to arise, and being able to measure whether interventions are making a difference.

The aim is to take data-informed, targeted actions proactively to mitigate overspeed risk and reduce incidents, before they occur. RSSB is working collaboratively with Network Rail and train operators to address these challenges through data, operational learning, and targeted interventions. Network Rail and the TOCs are using JORAT for the assessment of high-risk junctions, which will support the development of required mitigations at the identified junctions across the network.

These can be either engineering-based solutions such as active train controls systems, upgrades to the infrastructure, improved signal sighting or operational solutions such as better signage, changes in time-tabling or improvements to driver route knowledge.

RSSB has developed the Overspeed Indicator to identify where trains may be exceeding applicable speed restrictions. Currently being trialled with LNER on the East Coast Main Line, it will provide industry with the capability to understand the prevalence of overspeeding across the network, identify emerging trends and measure whether interventions are reducing risk over time.

overspeed-2

Its value lies in revealing operational behaviours that may remain unseen. A review of train movement data during a weather-related speed restriction identified a number of additional trains exceeding the temporary 50 mph restriction beyond those initially highlighted through traditional investigation routes.

This more complete picture enables a better understanding of the extent of where overspeeding may be an issue. By enabling an assessment of train speeds across signalling sections throughout the network, infrastructure managers can identify where overspeeding is occurring, understand the scale of the issue, and prioritise interventions where they will have the greatest impact.

Together, the two solutions provide a powerful risk management framework. JORAT helps the industry understand where overspeed risk is elevated, while the Overspeed Indicator helps identify where overspeeding is actually occurring. This enables operators to target competence development, route-knowledge enhancement, operational briefings, and engineering interventions using objective evidence, while supporting collaborative reviews between train operators and infrastructure managers.

The result is stronger organisational learning, more informed risk-based decision making, and a shift from reactive investigation to proactive prevention. Rather than waiting for a serious incident to reveal a vulnerability, the railway can identify, understand and manage overspeed risk earlier, and crucially, measure whether the actions taken are making a difference.