A study of track and train dynamic behavior of transition zone between concrete slab track and ballasted track

Last updated on 08 March 2013 2:21
When a train is traveling along the transition such as slab and ballasted track, dynamic behaviors of rail system and train are abruptly changed. In R&D project, the newly-developed precast slab track system and track transition between slab and ballasted track was planned to construct in 2006 on the newly-built...
Author(s): Kang Y.S.;Yang S.C.;Lee H.S.;Kim Y.B.;Jang S.Y.;Kim E.
2008
South Korea
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities