Probabilistic risk assessment of a PSC box girder railway bridge system considering construction phases using six sigma methodology

Last updated on 15 March 2013 4:14
Currently the prediction and the control of prestressing force and camber are designed deterministically in the design of cable stayed bridges or prestressed concrete bridges. However, the variation of qualities of materials and external loads have different types of probabilistic distributions, which could make additional error in the prediction and...
Author(s): Cho T.;Kim J.;Lee K.;Cha D.
Organisation(s): Korea Rail Network Authority ;
2008
South Korea
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities