Rectification of R89 section crane rails at Sizewell 'A' nuclear power station technical consultancy for Multiplex Construction Company Limited - (PP) (TR-MF-018)

Last updated on 12 April 2013 2:49
Drop stops fitted to the pile cap cranes at Sizewell A nuclear power station are designed to operate with a maximum of 5mm clearance between the stops and the rail surface. However, because of the fixed positions of the stops relative to the crane wheels, it was found that the...
Author(s): Davison I T;Purdy R
Organisation(s): British Rail Research ;