Aerodynamic and thermal design for the Great Belt tunnel (PP) (TR-AER-013)

Last updated on 21 July 2023 9:07
A tunnel is planned under the Great Belt to provide a rail connection between Copenhagen and western Denmark. Two twin bore options are under consideration, a bored tunnel 7.3 km long and an immersed tube tunnel 5.5. km long. A mixed operation involving both electric and diesel trains is planned.
Author(s): Pope C W;Johnson T;Broomhead S F
Organisation(s): British Rail Research ;
1988
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities