Prospects for reduced-cost electrification of B.R. secondary routes (TN-ETR-021)

Last updated on 21 June 2013 3:03
The basis of the present study is that if British Railways proceed with a long term electrification programme there will be a good case for electrification of freight and secondary lines feeding the "core" system. Generally, speeds and power requirements on freight lines are 1cw and signalling and communications systems...
Author(s): Rosser J.A.;Robertson C.;Smith W.R.
Organisation(s): British Rail Research ;
1980
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities