SPARK library
Search for a keyword, author, organisation, or reference.
Looking for RSSB-led research?
Investigation into the failure of EMU HV cables (TM-ETR-119)
Last updated on 21 June 2013 3:19
1. INTRODUCTION 1.1 Design On all electric multiple unit trains, the power is conveyed from the roof of the vehicle to the transformer via a flexible 25 kV cable. Because the original EMU's were made by different manufacturers, all the cable lengths and designs were different. Table 1...
Author(s):
Bradwell A;Billinge R H
Organisation(s):
British Rail Research ;
1979
United Kingdom
Log in or register to continue
Register for free individual access
- Unlock research, articles and more
- Get updates on RSSB’s activities
Already have an RSSB account?
- Log in to access content and download resources