Measurement of headwave pressures at Patchway tunnel March 1975 (IM-AERO-093)

Last updated on 26 July 2013 2:10
A initial transient pressure and flow recording equipment was carried out at Patchway tunnel 12th, 13th, 19th and 20th October 1974. This comprehensive exercise utilised an instrumented test train, and in addition Patchway tunnel was instrumented for pressure, air velocity and temperature. Although freightliner trains passed through the tunnel,...
Author(s): Arnold G.;Dean J.;Savoury D.
Organisation(s): British Rail Research ;
1975
United Kingdom