Instrumentation for procor tanker test (loaded) (27-29 Nove 1973) (IM-IS-191)

Last updated on 02 August 2013 3:17
The system consisted of 20 active gauges 9 of which were wired as rosettes the rest being single gauges. These were wired into data logging frame no1 with 9 meters of figure eight twin cable. This test was a repeat of a previous test on 21 MAY - 24 MAY...
Author(s): Guy S.
Organisation(s): British Rail Research ;
1970