Withdrawal criteria for vertical/longitudinal splits in rail heads and webs (RR-MF-030)

Last updated on 16 August 2013 3:59
At the time of this report, vertical/longitudinal splits cost the Civil Engineer about £1.5m per annum for rerailing. Withdrawal criteria had previously been relaxed and rationalised to a certain degree. The problem was the absence of a definite “failure point” for these defects. The objectives of the contract of which...
Author(s): Allery M.
Organisation(s): British Rail Research ;
1992
United Kingdom