SPARK library
Search for a keyword, author, organisation, or reference.
Looking for RSSB-led research?
A case study of determination of high-speed railway tunnel cross-section area due to the aerodynamic analysis in Korea
Last updated on 27 November 2013 10:15
With the spread of high-speed rail, problems which are not expected to occur in a general railway such as aural discomfort of passengers in a carriage and noise pollution from the tunnel exit have been raised. Such problems can be solved by determining the tunnel cross-section area to be large.
Author(s):
Lee Seong-Won;Kim Seon-Hong;Moon Yeon-Oh;Kim Ki-Lim;Kim Chan-Dong;Jo Hyeong-Jae
Organisation(s):
Korea Institute of Construction Technology ; Yooshin Engineering Co. ; Bumchang Engineering Co., Ltd ;
2013
South Korea
Log in or register to continue
Register for free individual access
- Unlock research, articles and more
- Get updates on RSSB’s activities
Already have an RSSB account?
- Log in to access content and download resources