SPARK library
Search for a keyword, author, organisation, or reference.
Looking for RSSB-led research?
Analysis of failures of bushings in english electric 25kV K-11 switchgear (TN-ETR-002)
Last updated on 03 December 2013 9:12
A total of 506 units of K-11 type 25kV switchgear are installed on L.M.R. Euston/Liverpool/Manchester electrified system. The switchgear was installed over the period 1959-1967. In 1967 audible discharge was reported on O.C.B. E/EA-5 at Euston T.S.C. and in February 1969 the cable side bushing (CS) was replaced by a...
Author(s):
Bradwell A.;Holmes R.
Organisation(s):
British Rail Research ;
1972
United Kingdom
Log in or register to continue
Register for free individual access
- Unlock research, articles and more
- Get updates on RSSB’s activities
Already have an RSSB account?
- Log in to access content and download resources