SPARK library
Search for a keyword, author, organisation, or reference.
Looking for RSSB-led research?
25 kV rigid overhead catenary system in 5.55m tunnel diameter for 3.9x3.2 m coaches in Delhi MRTS: Challenges
Last updated on 03 December 2013 11:42
Delhi MRTS Phase-I is designed as a heavy metro system to cater to 60,000 Phpdt (Peak Hour Passenger per Direction Trip), up gradable to 80,000 Phpdt. The detailed study indicated that either 1500 V dc or 25 kV ac is required to meet the above Phpdt, however, from energy efficiency,...
Author(s):
Kumar Satish;Sharma Sharat
Organisation(s):
Delhi Metro Rail Corporation ;
2009
India
Log in or register to continue
Register for free individual access
- Unlock research, articles and more
- Get updates on RSSB’s activities
Already have an RSSB account?
- Log in to access content and download resources