Development tests and stiffness calculations for British rail channel tunnel track to be installed at Radcliffe-on-Trent (TN-TAS-039)

Last updated on 09 December 2013 3:08
Part of the concrete slab test track installed at Radcliffe-on-Trent consists of a 72 metre long section of a track construction proposed for possible installation in the Channel Tunnel. A sketch of this track is shown as Fig 1. This was designated the BRCT section and consisted of longitudinal concrete...
Author(s): Aitken W K
Organisation(s): British Rail Research ;
1969
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities