Repeated loading tests on composite prestressed concrete bridge deck units (E-171)

Last updated on 13 December 2013 2:26
In connection with the British Hallways Modernisation scheme a number of bridges will be rebuilt and some economy is envisaged by the use of prestressed concrete. Par bridges which are to carry road traffic over electrified lines using overhead wires a design of minimum depth is required. The Chief...
Author(s): Anonymous
Organisation(s): British Rail Research ;
1957
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities