Piece-wise signalling replacement: Second interim report - Assessment of technical solutions (RR-STG-D-PSG-RP-002)

Last updated on 20 December 2013 11:01
This is the second Interim Report of an internally funded study into methods of re-signalling small sections of secondary route in a way that will permit the eventual amalgamation of the small sections into a large controlled area, a strategy known as Piece-Wise Re-Signalling. This report considers the technical...
Author(s): Watson R.G.
Organisation(s): British Rail Research ;
1996
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities