Copenhagen - Malmö tunnel transient pressures: November 1995 evaluation (RR-DYN-95-179)

Last updated on 20 December 2013 11:11
A study has been undertaken to investigate the pressure transients generated by trains travelling through the revised Copenhagen - Malmö railway tunnel. The revised design incorporates short double track sections at both the tunnel portals (249 m long at the west portal and 150 m long at the east portal).
Author(s): Figura G.I.;Temple J.
Organisation(s): British Rail Research ;
1995
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities