An investigation into current collection problems in Clapton Tunnels (ER) (TM-ES-31)

Last updated on 31 March 2014 2:23
1.1 Background In preparation for the changeover from 6.25 kV to 25 kV supply voltage, the overhead line equipment in Clapton Tunnels on the Eastern Region was modified to give increased electrical clearances. Within days, severe arcing and flashover at the 40 mile/hr line speed necessitated the introduction of...
Author(s): Evans JR;Beadle AR
Organisation(s): British Rail Research ;
1983
United Kingdom