Prospects for reduced-cost electrification of B.R. secondary routes (TN-ETR-21)

Last updated on 07 April 2014 12:48
The basis of the present study is that if British Railways proceed with a long term electrification programme there will be a good case for electrification of freight and secondary lines feeding the "core" system. Generally, speeds and power requirements on freight lines are low and signalling and communications systems...
Author(s): Rosser J A;Robertson C;Smith W R
Organisation(s): British Rail Research ;
1980
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities