Rectification of R89 section crane rails at Sizewell 'A' nuclear power station technical consultancy for Multiplex Construction Company Limited - (PP) (TR-MF-018(PP))

Last updated on 21 July 2023 9:53
Drop stops fitted to the pile cap cranes at Sizewell A nuclear power station are designed to operate with a maximum of 5mm clearance between the stops and the rail surface. However, because of the fixed positions of the stops relative to the crane wheels, it was found that the...
Author(s): Davison IT;Purdy R
Organisation(s): British Rail Research ;
1991
United Kingdom