Masonry arch repair project: Final report (RR-TCE-108)

Last updated on 13 August 2014 10:05
This report is the final report of the Arch Repair Project, which BRR, Track & Civil Engineering Team, conducted for Railtrack to study masonry arch repair and strengthening techniques through literature review and load testing. The report describes the work carried out during the study. Aspects of traditional brickwork...
Author(s): Yu Z M;Clamp N;Dean P A
Organisation(s): British Rail Research ;
1997
United Kingdom
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities