The introduction of high output wiring trains to the UK

Last updated on 02 September 2014 3:39
Railtrack's requirements to replace over 700 tension lengths of wire on the West Coast Route Modernisation programme called for a major step change in the type of equipment used and the methodology. In May 1999 the OLE & Distribution Alliance was funded by Railtrack to Design and Build two high...
Author(s): Walsh Terry
Organisation(s): OLE & ; Distribution Alliance ;
2003
United Kingdom