Optimal time between overhaul decision of power transmission drives and components of the high-speed railway vehicle

Last updated on 01 June 2016 3:42
The first driving device of the power bogies for the Korean high-speed railway vehicle consists of the traction motor (TM) and the motor reduction gears unit (MRU). Although TM and MRU are the mechanically integrated structures, their time between overhauls (TBO) require two separate intervals due to different technical requirements...
Author(s): Kim C.S.;Hwang J. H.;Jung J. T.
2016
South Korea
Log in or register to continue
Register for free individual access
  • Unlock research, articles and more
  • Get updates on RSSB’s activities