Standards Catalogue
Search for standards by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1), or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Sighting of Signals, Indicators, Signs and Lineside Markers
This document sets out requirements and gives guidance on the process used to confirm that train operators can reliably detect, read, interpret and…
RIS-0737-CCS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Engineering Certification of Railborne Plant and the Assessment of Non-Railborne Plant
This document sets out the industry agreed process for the certification of railborne plant and the assessment of non-railborne plant. It provides an…
RIS-1710-PLT Iss 2.1
September 2026
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
GERT8000-TW4 Iss 2
September 2026
Withdrawn
- Impact Assessments 1
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB Standards…
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer or competent person.
GERT8000-TW1 Iss 22
September 2026
Withdrawn
- Impact Assessments 1
Guidance Note on the Competence and Training of Freight Train Preparers
GOGN3617 assists railway undertakings in the creation of a framework for the training, competence and assessment of staff who undertake a freight…
Engineering Requirements for Dispatch of Trains from Platforms
RIS-8060-CCS sets out engineering requirements and guidance on control measures for train dispatch systems. The requirements and guidance complement…
RIS-8060-CCS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Duties of the machine controller (MC) and on-track plant operator
You will need this handbook if you carry out the duties of the machine controller (MC) and on-track plant operator.
GERT8000-HB15 Iss 7
September 2026
Withdrawn
- Impact Assessments 1
Requirements for the Operation of Freight Trains and the Conveyance of Dangerous Goods by any Train
RIS-3781-TOM sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.
RIS-3781-TOM Iss 2
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 9
September 2026
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Sighting of Signals, Indicators, Signs and Lineside Markers
This document sets out requirements and gives guidance on the process used to confirm that train operators can reliably detect, read, interpret and…
RIS-0737-CCS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Engineering Certification of Railborne Plant and the Assessment of Non-Railborne Plant
This document sets out the industry agreed process for the certification of railborne plant and the assessment of non-railborne plant. It provides an…
RIS-1710-PLT Iss 2.1
September 2026
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB Standards…
Guidance Note on the Competence and Training of Freight Train Preparers
GOGN3617 assists railway undertakings in the creation of a framework for the training, competence and assessment of staff who undertake a freight…
Engineering Requirements for Dispatch of Trains from Platforms
RIS-8060-CCS sets out engineering requirements and guidance on control measures for train dispatch systems. The requirements and guidance complement…
RIS-8060-CCS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Requirements for the Operation of Freight Trains and the Conveyance of Dangerous Goods by any Train
RIS-3781-TOM sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.
RIS-3781-TOM Iss 2
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Operational Requirements for GSM-R Radio
This document sets out requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system. The document…
RIS-3780-TOM Iss 2
January 0001
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Visibility of Rail Vehicles
This document is complementary to GMRT2131 and sets out requirements and guidance for the visibility of vehicles on GB mainline railway.
GMRT2131 Iss 1
January 0001
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 3
- Technical Notes 1
- Deviations 1
Audibility and Visibility of Trains
This document sets out requirements with associated guidance for audible and visible warning systems such that members of the public and trackside…
GMRT2131 Iss 1
January 0001
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 3
- Technical Notes 1
- Deviations 1
Audibility of Rail Vehicles
This document sets out GB industry agreed practice on installation, performance and maintenance of audible warning devices. It is complementary to…
GMRT2131 Iss 1
January 0001
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 3
- Technical Notes 1
- Deviations 1
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
GERT8000-TW4 Iss 2
September 2026
Withdrawn
- Impact Assessments 1
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer or competent person.
GERT8000-TW1 Iss 22
September 2026
Withdrawn
- Impact Assessments 1
Duties of the machine controller (MC) and on-track plant operator
You will need this handbook if you carry out the duties of the machine controller (MC) and on-track plant operator.
GERT8000-HB15 Iss 7
September 2026
Withdrawn
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 9
September 2026
Withdrawn
- Impact Assessments 1
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 13
September 2026
Withdrawn
- Impact Assessments 2
DC electrified lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
AC Electrified Lines
This module is required if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in AC…
Status
Lead/Supporting Committee(s)
Issue Date
From: To:Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).