Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Rail Vehicle Structures and Passive Safety
This document sets out requirements for the design and integrity of primary and secondary rail vehicle structures, including interior crashworthiness.
GMRT2100 Iss 6.1
June 2023
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lineside Operational Signs - Product Requirements
This document sets of the requirements of lineside operational signs that support technical compatibility with rail vehicle exterior lighting and…
GIRT7033 Iss 4
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
Management of Safety-Related Rail Vehicle Defects
This document defines requirements for recording, analysing and reporting safety-related defects, faults and failures on rail vehicles, plant and…
RIS-8250-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
Communication of urgent operating advice
This standard sets out requirements, rationale and guidance for reporting and communicating urgent operating safety information.
RIS-3350-TOM Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Axle Bearing Condition Monitoring
This document sets out requirements and guidance for condition monitoring of axle bearings, whether by trackside or onboard detection systems.
GEGN8614 Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
GERT8014 Iss 2
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Deviations 1
Urgent High-Risk Defect Report Form
In the event that the NIR-Online system is unavailable, details of urgent high-risk defects, faults and failures shall be shared by completing and…
Assessment of Passenger Seat Comfort
This document gives guidance on the assessment of static comfort for passenger seats on rolling stock. It includes criteria to measure aspects of a…
Text signs
This document provides design details for BB01 sign - Text signs.
Electrical hazard
This document provides design details for BD01 sign - Electrical hazard.
Mind the gap / step
This document provides design details for CA02 sign - Mind the gap / step.
Electrical hazard: warnings to the public
This document provides design details for CB01 sign - Electrical hazard: warnings to the public.
Supplementary sign for level crossings
This document provides design details for CC02 sign - Supplementary sign for level crossings.
Instructions for use at a vehicular crossing without a telephone (PCR diagram 102)
This document provides design details for CC04 sign - Instructions for use at a vehicular crossing without a telephone (PCR diagram 102).
Instructions for use at a vehicular crossing with a telephone (PCR diagram 103)
This document provides design details for CC05 sign - Instructions for use at a vehicular crossing with a telephone (PCR diagram 103).
Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram 105)
This document provides design details for CC07 sign - Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram…
Instructions for use at a crossing with miniature red / green lights and user-operated gates (PCR diagram 109)
This document provides design details for CC09 sign - Instructions for use at a crossing with miniature red / green lights and user-operated gates…
Reminder at a crossing with user-operated gates (PCR diagram 111)
This document provides design details for CC11 sign - Reminder at a crossing with user-operated gates (PCR diagram 111)
Document Type
Issue Date
From: To:Code of Practice Planning for the Use of Mobile Operated Plant
This Code of Practice details minimum requirements for planning for the use of mobile operated plant excluding lifting operations. It applies to…
COP0002 Iss 12
September 2023
Withdrawn
Reporting track defects
This poster is provided by the M&EE Networking Group to remind industry that any track defects which could affect plant and equipment safely…
Points run through
This poster is provided by the M&EE Networking Group to remind industry that points run throughs only occur when the rules are not followed.
Code of Practice for Loading of OTP
This Code of Practice gives guidance on the arrangements for loading and securing of typical loads associated with all on-track plant (OTP) whilst on…
Use of Mobile Devices
This poster is provided by the M&EE Networking Group to remind industry of the risks posed by using a mobile phone whilst driving a train. Further…
Code of Practice for Defective OTP Safety Critical Equipment
This Code of Practice details what actions should be undertake when On-Track Plant (OTP) is discovered to have defective safety critical equipment…
Code of Practice for Control of Mobile Communication Equipment use in Driving Cabs
This Code of Practice contains requirements and guidance for the control of mobile communication equipment use in the driving cabs of trains. It sets…
COP0129 Iss 1
June 2023
Withdrawn
Code of Practice for OTM Route Conducting Policy
This Code of Practice contains requirements and guidance for OTM driver’s route conducting or being conducted. Also to assist in the improvement of…
Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…