Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Changes to National Operations Publications for March 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
On-Train Camera Monitoring Systems
This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations
This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…
GLGN1620 Iss 1
March 2024
Withdrawn
- Briefing Notes: 1
Infrastructure Based Train Detection Interface Requirements
This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…
GKRT0028 Iss 3.1
March 2024
Withdrawn
- Briefing Notes: 1
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Station duties and train dispatch
You will need this module if you carry out the duties of a driver, a guard, a person in charge (PIC) of dispatch or staff responsible for train…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Temporary speed restriction directional arrows
This document provides design details for AF05 sign - Temporary speed restriction directional arrows.
Temporary speed restriction spate indicator
This document provides design details for AF07 sign - Temporary speed restriction spate indicator.
Neutral section warning board
This document provides design details for AJ01 sign - Neutral section warning board.
Open level crossing combined speed restriction / whistleboard
This document provides design details for AH02m sign - Open level crossing combined speed restriction / whistleboard.
Lower pantograph
This document provides design details for AJ03 sign - Lower pantograph.