Menu
Filter Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Document Type

Issue Date

From: To:
Sort By:
Results per page:

Live

Storage and Recommissioning of Rail Vehicles

This document sets out guidance on the storage and recommissioning of rail vehicles that are not to be operated on the GB mainline railway for an…

  • Briefing Notes: 1
  • Impact Assessments: 1

1 document(s) superseded

Guidance on the Storage and Recommissioning of Traction and Rolling Stock
GMGN2571 Iss 1
June 2022
Withdrawn
  • Briefing Notes: 1
Live

Lettered Differential Permissible Speeds Classification

This document sets out requirements and guidance for the classification of rail vehicles to the lettered differential permissible speed categories.

  • Briefing Notes: 1
  • Impact Assessments: 1

1 document(s) superseded

Rail Vehicle Lettered Differential Speeds Classification
RIS-2711-RST Iss 1
June 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live

Assessment of Compatibility of Rolling Stock and Infrastructure - Gauging and Stepping Distances

This document sets out requirements and responsibilities for the assessment of gauging compatibility and of stepping distances between rolling stock…

  • Briefing Notes: 1
  • Impact Assessments: 1

3 document(s) superseded

Assessment of Compatibility of Rolling Stock and Infrastructure - Gauging and Stepping Distances
GERT8273 Iss 1
June 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Guidance on Gauging and Platform Distances
GEGN8573 Iss 4
December 2015
Live
  • Briefing Notes: 1
Interface between Station Platforms, Track, Trains and Buffer Stops
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live

Format and Methods for Defining Vehicle Gauging Data

This document sets out requirements, rationale and guidance concerning how vehicle gauging data is generated and the format in which it is recorded.…

  • Briefing Notes: 1
  • Impact Assessments: 1

2 document(s) superseded

Format for Vehicle Gauging Data
RIS-2773-RST Iss 1
June 2022
Withdrawn
  • Briefing Notes: 1
  • Amendments: 4
Guidance on Gauging and Platform Distances
GEGN8573 Iss 4
December 2015
Live
  • Briefing Notes: 1
Live

Size of Vehicles and Position of Equipment

This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…

  • Briefing Notes: 1
  • Impact Assessments: 1

1 document(s) superseded

Size of Vehicles and Position of Equipment
GMRT2173 Iss 3
December 2019
Live Pending Withdrawal
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 3
Live

Changes to National Operations Publications for June 2022

This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…

1 document(s) superseded

Live

Interface between Station Platforms, Track, Trains and Buffer Stops

RIS-7016-INS brings together requirements to provide an integrated and consistent set covering station platforms, the interface between platforms,…

  • Briefing Notes: 1
  • Impact Assessments: 1

2 document(s) superseded

Interface between Station Platforms, Track, Trains and Buffer Stops
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Rail Industry Standard for Station Infrastructure
RIS-7700-INS Iss 3
June 2018
Live
  • Briefing Notes: 1
  • Impact Assessments 1
Live

GB Requirements for Platform Height, Platform Offset and Platform Width

GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.

  • Briefing Notes: 1
  • Impact Assessments: 1
  • Deviations 1

1 document(s) superseded

GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Iss 1.1
June 2019
Live Pending Withdrawal
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 46
Live

Managing Low Adhesion

This standard sets out a framework to develop, implement, monitor and review the effectiveness of site-specific plans to manage low adhesion at…

  • Briefing Notes: 1
  • Impact Assessments: 1

2 document(s) superseded

Low Adhesion between the Wheel and the Rail - Managing the Risk
RIS-8040-TOM Iss 1
June 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Amendments: 1
Guidance on Low Adhesion between the Wheel and the Rail - Managing the Risk
GEGN8540 Iss 2
June 2022
Withdrawn
  • Briefing Notes: 1
  • Amendments: 1
Live

Code of Practice for Plant Modules on Rail Wagons and Trailers

This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This Code of Practice covers…

1 document(s) superseded

Filter Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Withdrawn
Withdrawn
Withdrawn
Withdrawn
Withdrawn
Withdrawn
Filter Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

  • Impact Assessments: 1

1 document(s) superseded

Rule Book Module Issue History
GERT8000-Issue Iss 33
June 2022
Withdrawn
  • Impact Assessments 1
Live

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

1 document(s) superseded

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 36
June 2022
Withdrawn
Live

AC Electrified Lines

You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…

  • Impact Assessments: 1

1 document(s) superseded

AC Electrified Lines
GERT8000-AC Iss 6
June 2022
Withdrawn
  • Impact Assessments 1
Live

Duties of a designated person (DP) and people working on rail vehicles

You will need this module if you carry out the duties of a designated person or person working on a rail vehicle.

  • Impact Assessments: 1

1 document(s) superseded

Duties of a designated person (DP) and people working on rail vehicles
GERT8000-T10 Iss 4
December 2021
Withdrawn
  • Impact Assessments 1
Live

Preparation and movement of trains

You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer.

  • Impact Assessments: 1
  • Deviations 2

1 document(s) superseded

Preparation and movement of trains
GERT8000-TW1 Iss 16
December 2021
Withdrawn
  • Impact Assessments 1
  • Deviations 1
Live

General safety responsibilities and personal track safety for non-trackworkers

You will need this module if you carry out the duties of: • a train driver • a guard • a shunter • a designated person (DP) • a signaller • a crossing…

  • Impact Assessments: 1

1 document(s) superseded

General safety responsibilities and personal track safety for non-track workers
GERT8000-G1 Iss 8
December 2021
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live

Working single and bi-directional lines by pilotman

You will need this module if you carry out the duties of a pilotman, driver or signaller.

  • Impact Assessments: 1

1 document(s) superseded

Working single and bi-directional lines by pilotman
GERT8000-P2 Iss 5
December 2021
Withdrawn
  • Impact Assessments 1
Live

Observing and obeying signalling indications. Train warning systems. Reporting signalling failures and irregularities

You will need this module if you carry out the duties of a driver, person controlling train movements, shunter or signaller.

  • Impact Assessments: 1

1 document(s) superseded

Live

Single line working

You will need this module if you carry out the duties of a driver, a pilotman or a signaller in single line working.

  • Impact Assessments: 1

1 document(s) superseded

Single line working
GERT8000-P1 Iss 6
December 2021
Withdrawn
  • Impact Assessments 1
Live

Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)

You will need this module if you carry out the duties of a pilotman, driver or signaller.

  • Impact Assessments: 1

1 document(s) superseded

Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
GERT8000-S5 Iss 9
December 2021
Withdrawn
  • Impact Assessments 1
Filter Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live

GSM-R common shunt group access code

This document provides design details for DD01 sign - GSM-R common shunt group access code.

Live

GSM-R signal box phone number sign

This document provides design details for DD02 sign - GSM-R signal box phone number.

Live

Deviation for countdown markers

This document provides design details for DEV-AK102-02 sign - Deviation for platform countdown markers at ¾, ½ and ¼ mile on the approach to a…

Live

Entering and leaving an IVRS zone marker

This document provides design details for DC06 sign - Entering and leaving an IVRS zone marker.

Withdrawn
Withdrawn
Withdrawn
Filter Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page: