Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Changes to National Operations Publications for March 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations
This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…
GLGN1620 Iss 1
March 2024
Withdrawn
- Briefing Notes: 1
On-Train Camera Monitoring Systems
This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Infrastructure Based Train Detection Interface Requirements
This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…
GKRT0028 Iss 3.1
March 2024
Withdrawn
- Briefing Notes: 1
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Drugs and alcohol testing for safety-critical workers
This document provides transport operators with the industry-agreed standard for testing safety-critical workers for drugs and alcohol. It contains…
RIS-8070-TOM Iss 1
March 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GEGN8570 Iss 2
March 2022
Withdrawn
- Briefing Notes: 1
Accident and Incident Investigation
This document sets out requirements and guidance for the investigation of adverse events involving more than one duty holder so that system…
RIS-3119-TOM Iss 2.2
March 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Provisional SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the GORT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-B Iss 8
December 2021
Withdrawn
Provisional ERTMS SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the RT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-D Iss 3
December 2021
Withdrawn
Data Recorders on Trains
This document sets out engineering requirements and guidance for the provision and functionality of data recorders on trains.
RIS-2472-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline…
RIS-2453-RST Iss 2
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Supplier Assurance
This document is a standard for the generation of supplier assurance during the procurement cycle for products and services, for use in the GB rail…
RIS-2750-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance Note on the Management of Electrical Risk Related to Operational Tasks on Electrified Lines
This document provides railway undertakings and infrastructure managers (station operators) with guidance on the management and assessment of…
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track machines (OTMs) in running mode.
GMRT2400 Iss 6.1
December 2021
Withdrawn
- Briefing Notes: 1
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…
Form RT3185 Iss 12-15
December 2023
Withdrawn
Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Working of on-track machines (OTM)
You will need this module if you carry out the duties of a driver of an on-track machine, an operator of an on-track machine or a signaller.
GERT8000-OTM Iss 10
December 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Track circuit block regulations
You will need this module if you carry out the duties of a signaller in a track circuit block area.
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a: driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 10
December 2023
Withdrawn
- Impact Assessments 1
Signal Passed at Danger (SPAD) or Train Trip or Unauthorised Movement
For use by signallers in cases of a SPAD being investigated.
Form NR3189 Iss 1
December 2023
Withdrawn
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 6
December 2023
Withdrawn
- Impact Assessments 1
Lower pantograph
This document provides design details for AJ03 sign - Lower pantograph.
Temporary speed restriction warning boards (km/h)
This document provides design details for AF02k sign - Temporary speed restriction warning boards (km/h).
Horse riders to dismount at crossings where there are overhead electric lines
This document provides design details for CC17 sign - Horse riders to dismount at crossings where there are overhead electric lines.
Lineside telephone
This document provides design details for DB03 sign - Lineside telephone.
Telephone number
This document provides design details for DA01 sign - Telephone number
White diamond with 'X'
This document provides design details for DA03 sign - White diamond with 'X'.
Signal post telephone - limited clearance label
This document provides design details for DB02 sign - Signal post telephone - limited clearance label.
Mid-platform train berth markers
This document provides design details for AK105 sign - Mid-platform train berth markers.
Countdown markers
This document provides design details for AK102 sign - Countdown markers.
Commencement of AWS gap
This document provides design details for AA01 sign - Commencement of AWS gap.