Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:- RIS-2795-RST Iss 2.2
- Issue Date: December 2021
Track to Train RFID Compatibility
This document sets out requirement sfor RFID compatibility between train and track, including management of application codes.
- Briefing Notes: 1
1 document(s) superseded
RIS-2795-RST Iss 2.1
December 2021
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- GMRT2400 Iss 6.2
- Issue Date: December 2021
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track machines (OTMs) in running mode.
- Briefing Notes: 1
1 document(s) superseded
GMRT2400 Iss 6.1
December 2021
Withdrawn
- Briefing Notes: 1
- RIS-2453-RST Iss 2.1
- Issue Date: December 2021
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline…
- Briefing Notes: 1
1 document(s) superseded
RIS-2453-RST Iss 2
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- RIS-2750-RST Iss 1.1
- Issue Date: December 2021
Supplier Assurance
This document is a standard for the generation of supplier assurance during the procurement cycle for products and services, for use in the GB rail…
- Briefing Notes: 1
1 document(s) superseded
RIS-2750-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- GEGN8575 Iss 1
- Issue Date: December 2021
Guidance Note on the Management of Electrical Risk Related to Operational Tasks on Electrified Lines
This document provides railway undertakings and infrastructure managers (station operators) with guidance on the management and assessment of…
- Briefing Notes: 1
- Impact Assessments: 1
- Form RT3119-B Iss 9
- Issue Date: December 2021
Provisional SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the GORT3119 designated Provisional SPAD Data Collection forms when investigating signals…
- Briefing Notes: 1
1 document(s) superseded
Form RT3119-B Iss 8
December 2021
Withdrawn
- Form RT3119-D Iss 4
- Issue Date: December 2021
Provisional ERTMS SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the RT3119 designated Provisional SPAD Data Collection forms when investigating signals…
- Briefing Notes: 1
1 document(s) superseded
Form RT3119-D Iss 3
December 2021
Withdrawn
- GERT8000-HB17 Iss 4
- Issue Date: December 2021
DC electrified lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties.
- Impact Assessments: 1
1 document(s) superseded
- GERT8000-HB16 Iss 5
- Issue Date: December 2021
AC electrified lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties.
- Impact Assessments: 1
1 document(s) superseded
- GERT8000-Issue HB Iss 15
- Issue Date: December 2021
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book Handbook issues (GERT8000).
- Impact Assessments: 1
1 document(s) superseded
Popular Links
- Whats New June 2022
- Standards Catalogue June 2022 Live Docs
- Latest Updates to Standards
- Glossary of CCS terms
- Standards Categories
- References to EU legislation and institutions
- SPAD Data Collection Forms RT3119
- Rule Book Module Matrix
- Deviating from Standards
- Understanding and applying standards
- RSSB Standards Code
- RSSB Standards Manual
- Digital Railway - Integrated Concept of Operations
- Operational Concept for GBMR
- BSI Standards
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:- CESSBR0550 Sep 1964
- Issue Date: September 1964
- BR923A Feb 1964
- Issue Date: February 1964
- CESSBR0515A Sep 1963
- Issue Date: September 1963
- SSP020 05-63
- Issue Date: May 1963
- SSP018 01-63
- Issue Date: January 1963
- SSP019 01-63
- Issue Date: January 1963
- SSP021 01-63
- Issue Date: January 1963
- SSP023 01-63
- Issue Date: January 1963
- SSP024 01-63
- Issue Date: January 1963
- SSP022 01-63
- Issue Date: January 1963
Popular Links
- Whats New June 2022
- Standards Catalogue June 2022 Live Docs
- Latest Updates to Standards
- Glossary of CCS terms
- Standards Categories
- References to EU legislation and institutions
- SPAD Data Collection Forms RT3119
- Rule Book Module Matrix
- Deviating from Standards
- Understanding and applying standards
- RSSB Standards Code
- RSSB Standards Manual
- Digital Railway - Integrated Concept of Operations
- Operational Concept for GBMR
- BSI Standards
- GERT8000-Issue Iss 34
- Issue Date: December 2021
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
- Impact Assessments: 1
1 document(s) superseded
- GERT8000-RBBL Iss 37
- Issue Date: December 2021
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
1 document(s) superseded
- GERT8000-AC Iss 7
- Issue Date: December 2021
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
- Impact Assessments: 1
1 document(s) superseded
- GERT8000-T10 Iss 5
- Issue Date: September 2021
Duties of a designated person (DP) and people working on rail vehicles
You will need this module if you carry out the duties of a designated person or person working on a rail vehicle.
- Impact Assessments: 1
1 document(s) superseded
GERT8000-T10 Iss 4
December 2021
Withdrawn
- Impact Assessments 1
- GERT8000-TW1 Iss 17
- Issue Date: September 2021
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer.
- Impact Assessments: 1
- Deviations 2
1 document(s) superseded
GERT8000-TW1 Iss 16
December 2021
Withdrawn
- Impact Assessments 1
- Deviations 1
- GERT8000-G1 Iss 9
- Issue Date: September 2021
General safety responsibilities and personal track safety for non-trackworkers
You will need this module if you carry out the duties of: • a train driver • a guard • a shunter • a designated person (DP) • a signaller • a crossing…
- Impact Assessments: 1
1 document(s) superseded
GERT8000-G1 Iss 8
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- GERT8000-P2 Iss 6
- Issue Date: September 2021
Working single and bi-directional lines by pilotman
You will need this module if you carry out the duties of a pilotman, driver or signaller.
- Impact Assessments: 1
1 document(s) superseded
GERT8000-P2 Iss 5
December 2021
Withdrawn
- Impact Assessments 1
- GERT8000-S7 Iss 5
- Issue Date: September 2021
Observing and obeying signalling indications. Train warning systems. Reporting signalling failures and irregularities
You will need this module if you carry out the duties of a driver, person controlling train movements, shunter or signaller.
- Impact Assessments: 1
1 document(s) superseded
GERT8000-S7 Iss 4
December 2021
Withdrawn
- Impact Assessments 1
- GERT8000-P1 Iss 7
- Issue Date: September 2021
Single line working
You will need this module if you carry out the duties of a driver, a pilotman or a signaller in single line working.
- Impact Assessments: 1
1 document(s) superseded
- GERT8000-S5 Iss 10
- Issue Date: September 2021
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a pilotman, driver or signaller.
- Impact Assessments: 1
1 document(s) superseded
GERT8000-S5 Iss 9
December 2021
Withdrawn
- Impact Assessments 1
Popular Links
- Whats New June 2022
- Standards Catalogue June 2022 Live Docs
- Latest Updates to Standards
- Glossary of CCS terms
- Standards Categories
- References to EU legislation and institutions
- SPAD Data Collection Forms RT3119
- Rule Book Module Matrix
- Deviating from Standards
- Understanding and applying standards
- RSSB Standards Code
- RSSB Standards Manual
- Digital Railway - Integrated Concept of Operations
- Operational Concept for GBMR
- BSI Standards
- Sign AK104 Iss 2.1
- Issue Date: February 2021
Car Stop Markers on Station Platforms
Car Stop Markers on Station Platforms
- Briefing Notes: 1
1 document(s) superseded
- Sign AK216 Iss 1
- Issue Date: December 2020
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
- Sign BA05 Iss 1.1
- Issue Date: July 2019
No refuges sign
This document provides design details for BA05 sign - No refuges sign.
- Briefing Notes: 1
1 document(s) superseded
- Sign AK215 Iss 1
- Issue Date: September 2018
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
- Impact Assessments: 1
- Amendments: 1
- Sign AF03 Iss 2
- Issue Date: December 2015
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
1 document(s) superseded
- Sign DD03 Iss 1
- Issue Date: June 2015
GSM-R signal box phone number short code
This document provides design details for DD03 sign - GSM-R signal box phone number short code.
- Sign DEV-AK102-01
- Issue Date: June 2015
Deviation for countdown markers
This document provides design details for DEV-AK102-01 sign - Deviation for station approach countdown markers Applicable to the South West Trains…
- Sign DC05 Iss 1
- Issue Date: June 2015
Combined End of GSM-R and National Radio Network Channel Change Marker
This document provides design details for DC05 sign - Combined end of GSM-R and national radio network channel change marker.
- Sign AD04m Iss 1
- Issue Date: June 2015
Permissible speed warning indicators (mph) for limited clearance
This document provides design details for AD04m sign - Permissible speed warning indicators (mph) for limited clearance.
- Sign AE02m Iss 1
- Issue Date: June 2015
Enhanced permissible speed indicators (limited clearance)
This document provides design details for AE02m sign - Enhanced permissible speed indicators (limited clearance).
Popular Links
- Whats New June 2022
- Standards Catalogue June 2022 Live Docs
- Latest Updates to Standards
- Glossary of CCS terms
- Standards Categories
- References to EU legislation and institutions
- SPAD Data Collection Forms RT3119
- Rule Book Module Matrix
- Deviating from Standards
- Understanding and applying standards
- RSSB Standards Code
- RSSB Standards Manual
- Digital Railway - Integrated Concept of Operations
- Operational Concept for GBMR
- BSI Standards
Document Type
Issue Date
From: To:Popular Links
- Whats New June 2022
- Standards Catalogue June 2022 Live Docs
- Latest Updates to Standards
- Glossary of CCS terms
- Standards Categories
- References to EU legislation and institutions
- SPAD Data Collection Forms RT3119
- Rule Book Module Matrix
- Deviating from Standards
- Understanding and applying standards
- RSSB Standards Code
- RSSB Standards Manual
- Digital Railway - Integrated Concept of Operations
- Operational Concept for GBMR
- BSI Standards