Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 10
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 13
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 3
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 4
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment
This document sets out the approach for the management of signal overrun risk consistent with the application of the Common Safety Method on Risk…
GIRT7006 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
GIGN7606 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
Mechanical Trainstop System Interface
This document details the track / train interface requirements for mechanical trainstop systems. GERT8018 issue two which has been up-issued following…
GERT8018 Iss 1
December 2012
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 5
Guidance on Mechanical Trainstop System
This document gives guidance on GERT8018 issue two which has been up-issued following completion of the filtering process that identifies that a…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 3
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 4
Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment
This document sets out the approach for the management of signal overrun risk consistent with the application of the Common Safety Method on Risk…
GIRT7006 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
GIGN7606 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
Mechanical Trainstop System Interface
This document details the track / train interface requirements for mechanical trainstop systems. GERT8018 issue two which has been up-issued following…
GERT8018 Iss 1
December 2012
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 5
Guidance on Mechanical Trainstop System
This document gives guidance on GERT8018 issue two which has been up-issued following completion of the filtering process that identifies that a…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 10
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 13
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 9
December 2022
Withdrawn
- Impact Assessments 1