Menu

Creating a Site of Work Segregated from the Railway

Network Rail
Building designOperations

Synopsis

This manual allows site-based work to take place without the necessity to apply the specific control measures associated with the operational railway as defined within NR/L2/OHS/019, but in doing so requires other controls and a controlled environment. It improves safety by defining safe methods of work that, once in place, will eliminate, or reduce risk so far as is reasonably practical, to or from the operational railway. This manual specifies the requirements for the segregation of site-based work activities, including plant and vehicular deliveries, on Network Rail Managed Infrastructure (NRMI) from railway operations.
You will need to have access to Network Rail's Standards Library to view this standard.
Published
2024