Affordable signalling connections for new, smaller rail freight sites
Connecting new freight terminals to the main line is expensive and time consuming. Over one-half of these costs are associated with changes to the signalling system.
Many smaller terminal developments are unable to proceed because connection costs outweigh the business case. This significantly constrains expansion of rail freight capacity on the network as well as the modal shift from road to rail.
To address this barrier to freight growth, RSSB initiated research to identify a simpler, lower-cost approach to connecting new freight terminals to the network.
RSSB has developed the Overlay Freight Connection (OFC) concept. This is a ground, frame-based signalling solution that uses commercially available equipment already approved for use on the GB rail network. It avoids costly changes to existing signalling infrastructure.
Further work on the OFC included:
- Completing an independent safety assessment,
- Securing system approval from both Network Rail's Future Command and Control Signalling (FCCS) Panel and the Signalling Circuits Standards Working Group (SCSWG).
These approvals confirm the technical and operational viability of the OFC concept. We can now progress from a research outcome to a deployable solution that is ready for trial.
The OFC has an estimated cost of around £125,000. This is because it:
- Avoids changes to existing signalling, interlocking, and signaller control systems.
- Uses commercially available equipment already in use.
This represents a 90% plus reduction of signalling connection costs.
This step change in affordability opens opportunities for new freight terminals that would previously have been considered uneconomic. So, OFC creates a practical pathway for expanding rail freight capacity.
Following this work, RSSB is working with Network Rail, freight terminal owners, and rail freight customers to identify potential pilot sites to deploy and develop in-service trials.