Unlocking capacity by reviewing rolling stock traction power parameters
Traction power parameters for electric rolling stock operating on the GB 25 kV AC network have evolved over time.
Due to legacy rolling stock and infrastructure, different parameters and operating characteristics remain in use across the network. The origins, justification, and continued suitability of requirements—such as maximum trainset current limits and minimum voltage limits—are not well understood.
This raised an important question: are legacy traction power requirements unnecessarily restricting availability of train paths for trains running in electric mode?
The research investigated the background and rationale of key traction power requirements affecting the performance and capacity of the GB 25 kV AC electrified network.
Using performance and electrical system modelling, we assessed the impact of a range of parameters on train performance, system voltages, network capacity, and compatibility.
The parameters investigated were:
- maximum trainset current
- minimum voltages
- automatic current or power limitation as a function of line voltage
- power frequency harmonics.
The research concluded that:
- Improved voltage regulation and harmonised current limitation characteristics could make more effective use of available power between trains.
- Analysis of the established trainset current requirements (nominal 300A limit) showed that an increase would offer limited operational benefit.
- Modernised harmonic requirements could support long-term grid connection planning and future energy subsystem design.
- Clearer regenerative braking requirements could improve energy efficiency.
Pursuing these opportunities unlocks additional capacity from the existing 25kV AC electrified network without major infrastructure investment.
The findings are informing changes to current standards. These are being pursued by Network Rail and RSSB. They have also triggered further research. Together, these enable more efficient use of electrification assets. They support additional electric train paths while reducing and targeting the investment needed. Finally, they unlock overall system reliability and capacity.