Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Code of Practice for Management of Siding Safety Surveys
This Code of Practiceprovides guidance to enable the effective setting up of a safe system of work within all sidings allocated for stabling and…
Code of Practice for Route Knowledge within Possessions
This Code of Practice contains guidance and generic good practice for the management of route knowledge for train drivers within a possession. It sets…
Seasonal Operating of OTP
This poster is provided by the M&EE Networking Group to remind operators when adhesion is low, keep it slow.
Rail Handling – Rail Turner Awareness
This poster is provided by the M&EE Networking Group to remind industry about the competence requirements necessary for the Crane Controller and…
OTP Mechanical Movement Limiting Device
This poster is provided by the M&EE Networking Group to remind the industry about the use of mechanical movement limiting device and the restrictions…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
ERTMS National Identities Management
This document sets out the requirements for arrangements for the management of the ERTMS National Identities on the GB mainline railway.
GERT8072 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
Defective On-Train Equipment
This document sets out requirements to be applied when on-train equipment becomes defective and provides guidance to assist the railway undertakings…
RIS-3437-TOM Iss 2
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Trespass Risk Assessment
This document provides a common framework for trespass risk assessments, developed from the outputs of RSSB research project T1183 - Good practice…
Passenger Train Dispatch and Platform Safety Measures
This document sets out requirements and guidance for the development, review and implementation of passenger train dispatch processes and measures to…
RIS-3703-TOM Iss 4.1
September 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Process for Adding, Removing or Modifying Lettered Differential Permissible Speeds
This document sets out requirements and guidance to support the process of adding, removing or modifying a Lettered Differential Permissible Speed…
Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
This document sets out requirements and responsibilities for the assessment of technical compatibility at route level for vehicles and infrastructure.
RIS-8270-RST Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Client Safety Assurance of High Integrity Software-Based Systems for Railway Applications
This document sets out requirements for safety assurance of high integrity software-based systems for railway applications.
GEGN8650 Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
Interface between Station Platforms, Track, Trains and Buffer Stops
RIS-7016-INS brings together requirements to provide an integrated and consistent set covering station platforms, the interface between platforms,…
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-7700-INS Iss 3
June 2018
Live
- Briefing Notes: 1
- Impact Assessments 1
Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…
Form RT3185 Iss 12-15
December 2023
Withdrawn
Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Track circuit block regulations
You will need this module if you carry out the duties of a signaller in a track circuit block area.
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a: driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 10
December 2023
Withdrawn
- Impact Assessments 1
Signal Passed at Danger (SPAD) or Train Trip or Unauthorised Movement
For use by signallers in cases of a SPAD being investigated.
Form NR3189 Iss 1
December 2023
Withdrawn
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 6
December 2023
Withdrawn
- Impact Assessments 1
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
General signalling regulations
You will need this module if you carry out the duties of a signaller.
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller or train preparer.
Supplementary sign where crossing is used for animal traffic (PCR diagram 118)
This document provides design details for CC16 sign - Supplementary sign where crossing is used for animal traffic (PCR diagram 118).
Sign CC16 Iss 1
June 2023
Withdrawn
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
Horse riders to dismount at crossings where there are overhead electric lines
This document provides design details for CC17 sign - Horse riders to dismount at crossings where there are overhead electric lines.
Lineside telephone
This document provides design details for DB03 sign - Lineside telephone.
Telephone number
This document provides design details for DA01 sign - Telephone number
Document Type
Issue Date
From: To:Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…