Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:ERTMS Handbook
You will need this handbook if you need to understand how the European Rail Traffic Management System (ERTMS) operates on the GB network.
Signaller's Form for Working Single and Bi-Directional ERTMS Lines by Pilot
Signaller's form for working of single and bi-directional ERTMS lines by pilot.
Form RT3155 ERTMS Iss 06-13
December 2022
Withdrawn
Driver’s Ticket for Working Single and Bi-Directional Lines by Pilot
This form is issued by the pilot to drivers and records the details for the working of trains over a single or bi-directional line by pilot, during a…
Form RT3156 Iss 3
December 2022
Withdrawn
Written Order 04 Permission to Make a Wrong-Direction Movement Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Form RTWO04 Iss 12-13
December 2022
Withdrawn
Pilot's form for working of single and bi-directional ERTMS lines by pilot
Pilot's form for working of single and bi-directional ERTMS lines by pilot.
Form RT3154 ERTMS Iss 06-13
December 2022
Withdrawn
Driver’s Ticket for Working Single and Bi-Directional Lines by Pilot
This form is issued by the pilot to drivers and records the details for the working of trains over a single or bi-directional line by pilot, during a…
Form RT3156 ERTMS Iss 06-13
December 2022
Withdrawn
Signaller's Single Line Working Form
This form is used by the signaller to record the arrangements for implementing single line working.
Written Order 05 Permission To Proceed Under Modified Working Arrangements on Single and Bi-Directional Lines Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Form RTWO05 Iss 12-13
December 2022
Withdrawn
Duties of a designated person (DP) and people working on rail vehicles
You will need this module if you carry out the duties of a designated person or person working on a rail vehicle.
GERT8000-T10 Iss 5
December 2022
Withdrawn
- Impact Assessments 1
Pilot's form for working of single and bi-directional lines by pilot
This form is used by the pilot to record the details for the working of trains over single or bi-directional lines by pilot, during a failure or when…
Form RT3154 12-03
December 2022
Withdrawn
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Defect Reporting for OTP, Plant and Equipment
This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…
COP0012 Iss 7
December 2024
Withdrawn
Code of Practice for Defective OTP Safety Critical Equipment
This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…
Code of Practice for Load Lifting Points on Road Rail Excavator Cranes
This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…
COP0015 Iss 5
March 2025
Withdrawn
Code of Practice for Lifting Operations Using Manually Propelled Rail Handlers (MPRH)
This Code of Practice details the various minimum requirements for Lifting and handling loads with Manually Propelled Rail Handlers (MPRH). This Code…
COP0030 Iss 2
March 2025
Withdrawn
Code of Practice for Tandem Lifting with Two Excavator Cranes
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…
Code of Practice for Flailing Operations using OTP
This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…
Code of Practice for Planning for the use of non-rail mounted plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…
COP0028 Iss 1
March 2025
Withdrawn
Code of Practice for Independence and Competence of LOLER Thorough Examiners
This Code of Practice details the various minimum requirements for independence of the examiner for Thorough Examination of lifting equipment and…
COP0029 Iss 1
March 2025
Withdrawn
Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)
This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…
COP0007 Iss 7
March 2025
Withdrawn
Code of Practice for Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…