Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Indication of route
This document provides design details for sign AJ11 - Indication of route.
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Raise pantograph (temporary power changeover)
This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Maintaining the Visibility of Signals and Operational Signs
This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…
RIS-8034-CCS Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Changes to National Operations Publications for March 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:ERTMS National Identities Management
This document sets out the requirements for arrangements for the management of the ERTMS National Identities on the GB mainline railway.
GERT8072 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements and guidance for new, renewed and upgraded ac energy subsystem, and the interfaces to rolling stock and operation…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4
December 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements to the alternating current (ac) energy subsystem for all rolling stock operating over the Great Britain…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Train front-end visibility requirements and safe integration
This technical note clarifies the application of standards and legislation for front-end visibility and safe integration of rolling stock within the…
Process for Adding, Removing or Modifying Lettered Differential Permissible Speeds
This document sets out requirements and guidance to support the process of adding, removing or modifying a Lettered Differential Permissible Speed…
Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
This document sets out requirements and responsibilities for the assessment of technical compatibility at route level for vehicles and infrastructure.
RIS-8270-RST Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Changes to National Operations Publications for March 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 14.1
November 2024
Live Pending Withdrawal
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Plant Modules on Rail Wagons and Trailers
This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This covers the use of plant…
COP0035 Iss 2
September 2024
Withdrawn
Code of Practice for the Storage and Recommissioning of OTP
This Code of Practice is to define the actions that should be taken for any OTP designated as Out of Service recommending a minimum level of…
Code of Practice for OTM Driver Communication Review Group (CRG)
This Code of Practice supports the national strategy for improved Safety Critical Communications. It provides a collaborative process (M&EE Group OTM…
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…